# Cesspools (IPC 2009 Chapter 10)

> This chapter establishes the requirements and provisions for the design and installation of cesspools.

- Canonical: https://harth.build/resources/building-codes/us-states/new-hampshire/ipc-2009/cesspools/

<!-- harth-reference-scope:start -->

## Direct answer and reference scope

Cesspools (IPC 2009 Chapter 10) is presented here as a reference within the IPC 2009 collection for New Hampshire. This chapter establishes the requirements and provisions for the design and installation of cesspools. Use the [New Hampshire General Court, RSA 155-A](https://gc.nh.gov/rsa/html/xii/155-a/155-a-mrg.htm) to confirm the code edition currently adopted for the project, and compare the model text with state amendments, local amendments, effective dates and the permit authority's interpretation. The [ICC code library](https://codes.iccsafe.org/codes) is the model-code publication path. This Harth page is a searchable reference transcription, not an official code publication, legal opinion or confirmation that this edition controls a particular address. Record the project jurisdiction, application date, occupancy, construction type and amendment set before relying on a section. Where this page conflicts with an official publication or the authority having jurisdiction, the official source controls.

_Authored and prepared by Harth. Review scope: official verification path added; code text and current local applicability have not been independently reviewed._

<!-- harth-reference-scope:end -->

_This chapter establishes the requirements and provisions for the design and installation of cesspools._

## 1001 — General

1001.1 Scope. The provisions of this chapter shall govern the design and installation of cesspools.

1001.2 Application. Cesspools shall not be installed, except where approved by the code official. A cesspool shall be considered as only a temporary expedient pending the construction ofa public sewer; as an overflow facility where installed in conjunction with an existing cesspool; or as a means of sewage disposal for limited, minor or temporary applications.

1001.3 Construction. Cesspools shall conform to the construction requirements of Section 605.3 for seepage pits. The seepage pit shall have a minimum sidewall of 20 feet (6096 mm) below the inlet opening. Where a stratum of gravel or equally pervious material of 4 feet (1219 mm) or more in thickness is found, the sidewall need not be more than 10 feet (3048 mm) below the inlet.

![Labeled code-chapter diagram: Cesspools (IPC 2009 Chapter 10)](https://efwwel0vyt9vy5so.public.blob.vercel-storage.com/images/building-codes/us-states/new-hampshire/ipc-2009/cesspools/diagram-1344.webp)

*This chapter establishes the requirements and provisions for the design and installation of cesspools.*

## Frequently asked questions

### What aspects of cesspools does IPC Chapter 10 regulate?

IPC Chapter 10 governs the design and installation procedures for cesspools.

### Does the IPC 2009 allow for cesspool installation?

Yes, Chapter 10 provides the specific provisions that must be followed if cesspools are designed and installed.

---

- Continue in Harth (open this topic in the Harth agent): https://app.harth.build/?context=%2Fresources%2Fbuilding-codes%2Fus-states%2Fnew-hampshire%2Fipc-2009%2Fcesspools%2F
- View this page in a browser: https://harth.build/resources/building-codes/us-states/new-hampshire/ipc-2009/cesspools/
- All resources for agents: https://harth.build/llms.txt
