# House Construction Cost Planning: Abuja, Nigeria

> Abuja house cost planning using the World Bank ICP 2021 national construction price-level index of 72.8, plus a GeoNames-based local comparable-search shortlist.

- Canonical: https://harth.build/resources/construction-costs/house-construction-cost-abuja-ng/
- Last updated: 2026-09-15
- Data source: National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/NGA/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames NG dump](https://download.geonames.org/export/dump/NG.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2352778). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

## Key facts

| Fact | Value |
| --- | --- |
| National construction PLI | 72.8 (World Bank ICP 2021; World = 100) |
| Screening ratio to world | 0.728 (dimensionless PLI ÷ 100; not a city location factor) |
| Locality reference | 9.0579, 7.4951 (GeoNames ID 2352778) |
| Snapshot population | 2,690,000 (4 of 50 listed Nigeria places) |
| Nearest listed peer | Minna · 121 km (great-circle distance between GeoNames reference points) |
| Estimate currency | NGN (obtain a current local rate and named base date) |

## Direct answer

For early house construction cost planning in Abuja, the World Bank ICP reports a 2021 Nigeria construction price-level index of 72.8, with the world equal to 100. This is a national comparison—not a Abuja NGN/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Nigeria in 2021; it does not measure a Abuja market basket or current house tenders. GeoNames 2352778 records the locality at 9.0579, 7.4951, with snapshot population 2,690,000. That ranks Abuja 4 of 50 listed places, while Minna is the nearest listed peer at about 121 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

*Content and cited inputs reviewed by [Scott Barrington](https://nz.linkedin.com/in/barrington), Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.*

## What does the 72.8 construction index mean?

The World Bank ICP 2021 construction PLI for **Nigeria is 72.8**, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that house work in Abuja costs 0.728 times a current world rate.

## Which Abuja inputs are known?

The reproducible locality point is **9.0579, 7.4951** (GeoNames 2352778). Its snapshot population is **2,690,000**, ranked 4 of 50 listed places; GeoNames classifies it as a national capital in administrative area 11. These facts shape the local comparable search, not the price.

## What must a project estimate add?

For a Abuja house project, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms. Use a consistent gross-floor-area basis and record the following before reliance.

| Estimate field | Screening record | Project requirement |
| --- | --- | --- |
| National context | ICP 2021 PLI 72.8 | Retain only as dated cross-country context |
| Local NGN/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |

## Abuja comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

| Listed place | Great-circle km from Abuja | Snapshot population | Admin area |
| --- | ---: | ---: | --- |
| Minna | 121 | 425,000 | 31 |
| Bida | 163 | 400,000 | 31 |
| Kaduna | 163 | 1,850,000 | 23 |
| Jos | 181 | 1,040,000 | 49 |
| Makurdi | 186 | 390,000 | 26 |
| Port Harcourt | 479 | 2,120,000 | 50 |
| Ibadan | 437 | 3,649,000 | 32 |
| Benin City | 366 | 1,782,000 | 37 |

## Price-level normalization worksheet

For a validated reference rate **R** from a country with construction PLI **P**, the transparent screening calculation is **R × (72.8 ÷ P)**. At P = 100 the dimensionless ratio is 0.728; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

| Input | Recorded value | Release condition |
| --- | --- | --- |
| Target national PLI | 72.8 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Abuja adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |

## Where can you explore related guidance?

- [Explore all construction costs guidance](https://harth.build/resources/construction-costs.md)
- [Office Construction Cost Planning: Abuja, Nigeria](https://harth.build/resources/construction-costs/office-construction-cost-abuja-ng.md)
- [School Construction Cost Planning: Abuja, Nigeria](https://harth.build/resources/construction-costs/school-construction-cost-abuja-ng.md)
- [Retail Construction Cost Planning: Abuja, Nigeria](https://harth.build/resources/construction-costs/retail-construction-cost-abuja-ng.md)
- [House Construction Cost Planning: Minna, Nigeria](https://harth.build/resources/construction-costs/house-construction-cost-minna-ng.md)
- [All construction costs guidance for Nigeria](https://harth.build/resources/construction-costs/nigeria.md)
- [Climate Design Data: Abuja, Nigeria](https://harth.build/resources/climate-data/climate-design-data-abuja-ng.md)
- [Sun Path: Abuja, Nigeria](https://harth.build/resources/solar-data/sun-path-abuja-ng.md)

## Sources and method

National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/NGA/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames NG dump](https://download.geonames.org/export/dump/NG.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2352778). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

### Source links

- [api.worldbank.org](https://api.worldbank.org/v2/sources/90/country/NGA/classification/PX.WL/series/1501200/time/YR2021/data?format=json)

- [worldbank.org](https://www.worldbank.org/en/programs/icp/data)

- [download.geonames.org](https://download.geonames.org/export/dump/NG.zip)

## Frequently asked questions

### Does the 72.8 index give a house cost per m² for Abuja?

No. 72.8 is the World Bank ICP 2021 national construction price-level index for Nigeria, with the world equal to 100. It is a cross-country screening statistic, not a Abuja NGN/m² rate, escalation index, quote or tender estimate.

### How should a Abuja house estimate replace this screening benchmark?

Collect current Abuja comparables on a consistent gross-floor-area basis, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.

---

- Continue in Harth (open this topic in the Harth agent): https://app.harth.build/agent?context=%2Fresources%2Fconstruction-costs%2Fhouse-construction-cost-abuja-ng%2F
- View this page in a browser: https://harth.build/resources/construction-costs/house-construction-cost-abuja-ng/
- All resources for agents: https://harth.build/llms.txt
