# House Construction Cost Planning: Clementi Housing Estate, Singapore

> Clementi Housing Estate house cost planning using the World Bank ICP 2021 national construction price-level index of 97.6, plus a GeoNames-based local comparable-search shortlist.

- Canonical: https://harth.build/resources/construction-costs/house-construction-cost-clementi-housing-estate-sg/
- Last updated: 2026-09-15
- Data source: National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/SGP/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames SG dump](https://download.geonames.org/export/dump/SG.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1884384). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

## Key facts

| Fact | Value |
| --- | --- |
| National construction PLI | 97.6 (World Bank ICP 2021; World = 100) |
| Screening ratio to world | 0.976 (dimensionless PLI ÷ 100; not a city location factor) |
| Locality reference | 1.3158, 103.7647 (GeoNames ID 1884384) |
| Snapshot population | 92,420 (27 of 50 listed Singapore places) |
| Nearest listed peer | Jurong East · 3 km (great-circle distance between GeoNames reference points) |
| Estimate currency | SGD (obtain a current local rate and named base date) |

## Direct answer

For early house construction cost planning in Clementi Housing Estate, the World Bank ICP reports a 2021 Singapore construction price-level index of 97.6, with the world equal to 100. This is a national comparison—not a Clementi Housing Estate SGD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Singapore in 2021; it does not measure a Clementi Housing Estate market basket or current house tenders. GeoNames 1884384 records the locality at 1.3158, 103.7647, with snapshot population 92,420. That ranks Clementi Housing Estate 27 of 50 listed places, while Jurong East is the nearest listed peer at about 3 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

*Content and cited inputs reviewed by [Scott Barrington](https://nz.linkedin.com/in/barrington), Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.*

## What does the 97.6 construction index mean?

The World Bank ICP 2021 construction PLI for **Singapore is 97.6**, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that house work in Clementi Housing Estate costs 0.976 times a current world rate.

## Which Clementi Housing Estate inputs are known?

The reproducible locality point is **1.3158, 103.7647** (GeoNames 1884384). Its snapshot population is **92,420**, ranked 27 of 50 listed places; GeoNames classifies it as a section of a populated place in administrative area 00. These facts shape the local comparable search, not the price.

## What must a project estimate add?

For a Clementi Housing Estate house project, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms. Use a consistent gross-floor-area basis and record the following before reliance.

| Estimate field | Screening record | Project requirement |
| --- | --- | --- |
| National context | ICP 2021 PLI 97.6 | Retain only as dated cross-country context |
| Local SGD/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |

## Clementi Housing Estate comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

| Listed place | Great-circle km from Clementi Housing Estate | Snapshot population | Admin area |
| --- | ---: | ---: | --- |
| Jurong East | 3 | 72,960 | 04 |
| Bukit Timah | 3 | 85,900 | 00 |
| Bukit Batok New Town | 5 | 158,030 | 00 |
| Queenstown Estate | 5 | 101,480 | 00 |
| Jurong Town | 5 | 262,730 | 05 |
| Bishan New Town | 10 | 87,320 | 00 |
| Kallang | 11 | 101,290 | 00 |

## Price-level normalization worksheet

For a validated reference rate **R** from a country with construction PLI **P**, the transparent screening calculation is **R × (97.6 ÷ P)**. At P = 100 the dimensionless ratio is 0.976; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

| Input | Recorded value | Release condition |
| --- | --- | --- |
| Target national PLI | 97.6 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Clementi Housing Estate adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |

## Where can you explore related guidance?

- [Explore all construction costs guidance](https://harth.build/resources/construction-costs.md)
- [Office Construction Cost Planning: Clementi Housing Estate, Singapore](https://harth.build/resources/construction-costs/office-construction-cost-clementi-housing-estate-sg.md)
- [School Construction Cost Planning: Clementi Housing Estate, Singapore](https://harth.build/resources/construction-costs/school-construction-cost-clementi-housing-estate-sg.md)
- [Retail Construction Cost Planning: Clementi Housing Estate, Singapore](https://harth.build/resources/construction-costs/retail-construction-cost-clementi-housing-estate-sg.md)
- [House Construction Cost Planning: Jurong East, Singapore](https://harth.build/resources/construction-costs/house-construction-cost-jurong-east-sg.md)
- [All construction costs guidance for Singapore](https://harth.build/resources/construction-costs/singapore.md)
- [Sun Path: Clementi Housing Estate, Singapore](https://harth.build/resources/solar-data/sun-path-clementi-housing-estate-sg.md)

## Sources and method

National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/SGP/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames SG dump](https://download.geonames.org/export/dump/SG.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1884384). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

### Source links

- [api.worldbank.org](https://api.worldbank.org/v2/sources/90/country/SGP/classification/PX.WL/series/1501200/time/YR2021/data?format=json)

- [worldbank.org](https://www.worldbank.org/en/programs/icp/data)

- [download.geonames.org](https://download.geonames.org/export/dump/SG.zip)

## Frequently asked questions

### Does the 97.6 index give a house cost per m² for Clementi Housing Estate?

No. 97.6 is the World Bank ICP 2021 national construction price-level index for Singapore, with the world equal to 100. It is a cross-country screening statistic, not a Clementi Housing Estate SGD/m² rate, escalation index, quote or tender estimate.

### How should a Clementi Housing Estate house estimate replace this screening benchmark?

Collect current Clementi Housing Estate comparables on a consistent gross-floor-area basis, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.

---

- Continue in Harth (open this topic in the Harth agent): https://app.harth.build/agent?context=%2Fresources%2Fconstruction-costs%2Fhouse-construction-cost-clementi-housing-estate-sg%2F
- View this page in a browser: https://harth.build/resources/construction-costs/house-construction-cost-clementi-housing-estate-sg/
- All resources for agents: https://harth.build/llms.txt
