# House Construction Cost Planning: Jelebu, Singapore

> Jelebu house cost planning using the World Bank ICP 2021 national construction price-level index of 97.6, plus a GeoNames-based local comparable-search shortlist.

- Canonical: https://harth.build/resources/construction-costs/house-construction-cost-jelebu-sg/
- Last updated: 2026-09-15
- Data source: National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/SGP/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames SG dump](https://download.geonames.org/export/dump/SG.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 13118135). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

## Key facts

| Fact | Value |
| --- | --- |
| National construction PLI | 97.6 (World Bank ICP 2021; World = 100) |
| Screening ratio to world | 0.976 (dimensionless PLI ÷ 100; not a city location factor) |
| Locality reference | 1.3795, 103.7629 (GeoNames ID 13118135) |
| Snapshot population | 29,960 (43 of 50 listed Singapore places) |
| Nearest listed peer | Bukit Panjang New Town · 0 km (great-circle distance between GeoNames reference points) |
| Estimate currency | SGD (obtain a current local rate and named base date) |

## Direct answer

For early house construction cost planning in Jelebu, the World Bank ICP reports a 2021 Singapore construction price-level index of 97.6, with the world equal to 100. This is a national comparison—not a Jelebu SGD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Singapore in 2021; it does not measure a Jelebu market basket or current house tenders. GeoNames 13118135 records the locality at 1.3795, 103.7629, with snapshot population 29,960. That ranks Jelebu 43 of 50 listed places, while Bukit Panjang New Town is the nearest listed peer at about 0 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

*Content and cited inputs reviewed by [Scott Barrington](https://nz.linkedin.com/in/barrington), Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.*

## What does the 97.6 construction index mean?

The World Bank ICP 2021 construction PLI for **Singapore is 97.6**, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that house work in Jelebu costs 0.976 times a current world rate.

## Which Jelebu inputs are known?

The reproducible locality point is **1.3795, 103.7629** (GeoNames 13118135). Its snapshot population is **29,960**, ranked 43 of 50 listed places; GeoNames classifies it as a section of a populated place in administrative area not stated. These facts shape the local comparable search, not the price.

## What must a project estimate add?

For a Jelebu house project, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms. Use a consistent gross-floor-area basis and record the following before reliance.

| Estimate field | Screening record | Project requirement |
| --- | --- | --- |
| National context | ICP 2021 PLI 97.6 | Retain only as dated cross-country context |
| Local SGD/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |

## Jelebu comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

| Listed place | Great-circle km from Jelebu | Snapshot population | Admin area |
| --- | ---: | ---: | --- |
| Bukit Panjang New Town | 0 | 138,050 | 05 |
| Saujana | 1 | 25,000 | not stated |
| Fajar | 1 | 26,420 | not stated |
| Choa Chu Kang New Town | 1 | 187,550 | 03 |
| Keat Hong Village | 2 | 39,370 | 00 |
| Boon Lay | 11 | 29,510 | 00 |
| Thomson | 10 | 29,390 | 00 |
| Yio Chu Kang | 10 | 28,350 | 00 |

## Price-level normalization worksheet

For a validated reference rate **R** from a country with construction PLI **P**, the transparent screening calculation is **R × (97.6 ÷ P)**. At P = 100 the dimensionless ratio is 0.976; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

| Input | Recorded value | Release condition |
| --- | --- | --- |
| Target national PLI | 97.6 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Jelebu adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |

## Where can you explore related guidance?

- [Explore all construction costs guidance](https://harth.build/resources/construction-costs.md)
- [Office Construction Cost Planning: Jelebu, Singapore](https://harth.build/resources/construction-costs/office-construction-cost-jelebu-sg.md)
- [School Construction Cost Planning: Jelebu, Singapore](https://harth.build/resources/construction-costs/school-construction-cost-jelebu-sg.md)
- [Retail Construction Cost Planning: Jelebu, Singapore](https://harth.build/resources/construction-costs/retail-construction-cost-jelebu-sg.md)
- [House Construction Cost Planning: Bukit Panjang New Town, Singapore](https://harth.build/resources/construction-costs/house-construction-cost-bukit-panjang-new-town-sg.md)
- [All construction costs guidance for Singapore](https://harth.build/resources/construction-costs/singapore.md)
- [Sun Path: Jelebu, Singapore](https://harth.build/resources/solar-data/sun-path-jelebu-sg.md)

## Sources and method

National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/SGP/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames SG dump](https://download.geonames.org/export/dump/SG.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 13118135). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

### Source links

- [api.worldbank.org](https://api.worldbank.org/v2/sources/90/country/SGP/classification/PX.WL/series/1501200/time/YR2021/data?format=json)

- [worldbank.org](https://www.worldbank.org/en/programs/icp/data)

- [download.geonames.org](https://download.geonames.org/export/dump/SG.zip)

## Frequently asked questions

### Does the 97.6 index give a house cost per m² for Jelebu?

No. 97.6 is the World Bank ICP 2021 national construction price-level index for Singapore, with the world equal to 100. It is a cross-country screening statistic, not a Jelebu SGD/m² rate, escalation index, quote or tender estimate.

### How should a Jelebu house estimate replace this screening benchmark?

Collect current Jelebu comparables on a consistent gross-floor-area basis, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.

---

- Continue in Harth (open this topic in the Harth agent): https://app.harth.build/agent?context=%2Fresources%2Fconstruction-costs%2Fhouse-construction-cost-jelebu-sg%2F
- View this page in a browser: https://harth.build/resources/construction-costs/house-construction-cost-jelebu-sg/
- All resources for agents: https://harth.build/llms.txt
