# Office Construction Cost Planning: Victoria, Hong Kong SAR, China

> Victoria office cost planning using the World Bank ICP 2021 national construction price-level index of 141.8, plus a GeoNames-based local comparable-search shortlist.

- Canonical: https://harth.build/resources/construction-costs/office-construction-cost-victoria-hk/
- Last updated: 2026-09-15
- Data source: National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/HKG/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames HK dump](https://download.geonames.org/export/dump/HK.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1931681). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

## Key facts

| Fact | Value |
| --- | --- |
| National construction PLI | 141.8 (World Bank ICP 2021; World = 100) |
| Screening ratio to world | 1.418 (dimensionless PLI ÷ 100; not a city location factor) |
| Locality reference | 22.2875, 114.1442 (GeoNames ID 1931681) |
| Snapshot population | 956,800 (5 of 50 listed Hong Kong SAR, China places) |
| Nearest listed peer | Kennedy Town · 2 km (great-circle distance between GeoNames reference points) |
| Estimate currency | HKD (obtain a current local rate and named base date) |

## Direct answer

For early office construction cost planning in Victoria, the World Bank ICP reports a 2021 Hong Kong SAR, China construction price-level index of 141.8, with the world equal to 100. This is a national comparison—not a Victoria HKD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Hong Kong SAR, China in 2021; it does not measure a Victoria market basket or current office tenders. GeoNames 1931681 records the locality at 22.2875, 114.1442, with snapshot population 956,800. That ranks Victoria 5 of 50 listed places, while Kennedy Town is the nearest listed peer at about 2 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

*Content and cited inputs reviewed by [Scott Barrington](https://nz.linkedin.com/in/barrington), Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.*

## What does the 141.8 construction index mean?

The World Bank ICP 2021 construction PLI for **Hong Kong SAR, China is 141.8**, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that office work in Victoria costs 1.418 times a current world rate.

## Which Victoria inputs are known?

The reproducible locality point is **22.2875, 114.1442** (GeoNames 1931681). Its snapshot population is **956,800**, ranked 5 of 50 listed places; GeoNames classifies it as a populated place in administrative area HCW. These facts shape the local comparable search, not the price.

## What must a project estimate add?

For a Victoria office project, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport. Use a consistent gross-floor-area basis and record the following before reliance.

| Estimate field | Screening record | Project requirement |
| --- | --- | --- |
| National context | ICP 2021 PLI 141.8 | Retain only as dated cross-country context |
| Local HKD/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |

## Victoria comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

| Listed place | Great-circle km from Victoria | Snapshot population | Admin area |
| --- | ---: | ---: | --- |
| Kennedy Town | 2 | 38,000 | HCW |
| Pok Fu Lam | 3 | 77,100 | HSO |
| Wan Chai | 3 | 166,695 | HWC |
| Hong Kong | 3 | 7,396,076 | not stated |
| Jordan | 3 | 41,537 | KYT |
| Hong Kong Island | 5 | 1,195,529 | 00 |
| Tuen Mun | 21 | 507,900 | NTM |
| Sha Tin | 11 | 495,200 | NST |

## Price-level normalization worksheet

For a validated reference rate **R** from a country with construction PLI **P**, the transparent screening calculation is **R × (141.8 ÷ P)**. At P = 100 the dimensionless ratio is 1.418; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

| Input | Recorded value | Release condition |
| --- | --- | --- |
| Target national PLI | 141.8 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Victoria adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |

## Where can you explore related guidance?

- [Explore all construction costs guidance](https://harth.build/resources/construction-costs.md)
- [House Construction Cost Planning: Victoria, Hong Kong SAR, China](https://harth.build/resources/construction-costs/house-construction-cost-victoria-hk.md)
- [School Construction Cost Planning: Victoria, Hong Kong SAR, China](https://harth.build/resources/construction-costs/school-construction-cost-victoria-hk.md)
- [Retail Construction Cost Planning: Victoria, Hong Kong SAR, China](https://harth.build/resources/construction-costs/retail-construction-cost-victoria-hk.md)
- [Office Construction Cost Planning: Kennedy Town, Hong Kong SAR, China](https://harth.build/resources/construction-costs/office-construction-cost-kennedy-town-hk.md)
- [All construction costs guidance for Hong Kong](https://harth.build/resources/construction-costs/hong-kong.md)
- [Daylight & Orientation: Victoria, Hong Kong](https://harth.build/resources/solar-data/daylight-orientation-victoria-hk.md)
- [Solar Altitude & Azimuth: Victoria, Hong Kong](https://harth.build/resources/solar-data/solar-altitude-azimuth-victoria-hk.md)
- [Solar Shading Design: Victoria, Hong Kong](https://harth.build/resources/solar-data/solar-shading-design-victoria-hk.md)
- [Sun Path: Victoria, Hong Kong](https://harth.build/resources/solar-data/sun-path-victoria-hk.md)

## Sources and method

National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/HKG/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames HK dump](https://download.geonames.org/export/dump/HK.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1931681). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

### Source links

- [api.worldbank.org](https://api.worldbank.org/v2/sources/90/country/HKG/classification/PX.WL/series/1501200/time/YR2021/data?format=json)

- [worldbank.org](https://www.worldbank.org/en/programs/icp/data)

- [download.geonames.org](https://download.geonames.org/export/dump/HK.zip)

## Frequently asked questions

### Does the 141.8 index give a office cost per m² for Victoria?

No. 141.8 is the World Bank ICP 2021 national construction price-level index for Hong Kong SAR, China, with the world equal to 100. It is a cross-country screening statistic, not a Victoria HKD/m² rate, escalation index, quote or tender estimate.

### How should a Victoria office estimate replace this screening benchmark?

Collect current Victoria comparables on a consistent gross-floor-area basis, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.

---

- Continue in Harth (open this topic in the Harth agent): https://app.harth.build/agent?context=%2Fresources%2Fconstruction-costs%2Foffice-construction-cost-victoria-hk%2F
- View this page in a browser: https://harth.build/resources/construction-costs/office-construction-cost-victoria-hk/
- All resources for agents: https://harth.build/llms.txt