# Ready Access (to): Building Code Definition

> How the IRC 2009, IMC 2009 define ready access (to), where the wording differs, and which chapters depend on the term.

- Canonical: https://harth.build/resources/glossary/ready-access-to/
- Last updated: 2026-09-07
- Data source: Definitions quoted from the 2009 International Codes as transcribed in this site's building-codes collection, with the source chapter linked for each quotation. Usage counts are computed over the chapters hosted here, one copy per code. The [ICC code library](https://codes.iccsafe.org/codes) publishes the current model text and the [ICC adoption maps](https://www.iccsafe.org/advocacy/code-adoption-maps/) show which edition a jurisdiction has adopted; those sources control.

## Key facts

| Fact | Value |
| --- | --- |
| Defined in | IRC 2009, IMC 2009 (2009 editions transcribed in this corpus) |
| Primary source | IRC 2009 Fuel Gas (model text, not a jurisdiction's adopted text) |
| Chapters using the term | 2 (counted across the codes hosted here) |
| Wording identical across codes | No (compare before citing one code's wording under another) |

## Direct answer

Ready access (to) is a defined term in the International Residential Code (IRC) 2009, in Fuel Gas. The code's own words are: “That which enables a device, appliance or equipmentto be directly reached, without requiring the removal or movement of any panel, door or similar obstruction. (See "Access.")” The IMC 2009 defines the same term with different wording, so the controlling text depends on which code governs the question in front of you — the comparison below sets the versions side by side. The term is used in 2 chapters of this corpus, most often in Definitions (IMC 2009), Fuel Gas (IRC 2009). These pages transcribe the 2009 model text; verify the definition against the edition and amendments your authority having jurisdiction has adopted.

*Content and cited inputs reviewed by [Scott Barrington](https://nz.linkedin.com/in/barrington), Harth founder and architectural technology specialist · Published 2026-09-07 · Updated 2026-09-07.*

## What does this term mean?

**Ready Access (to)** — IRC 2009, Fuel Gas:

> That which enables a device, appliance or equipmentto be directly reached, without requiring the removal or movement of any panel, door or similar obstruction. (See "Access.")

![Labeled code-term definition diagram: Ready Access (to): Building Code Definition](https://efwwel0vyt9vy5so.public.blob.vercel-storage.com/images/glossary/ready-access-to/diagram-1344.webp)

*How the IRC 2009, IMC 2009 define ready access (to), where the wording differs, and which chapters depend on the term.*

## What must be verified before using this guidance?

Two of the I-Codes in this corpus define **Ready Access (to)**, and the wording is not identical — read the version that governs your question.

| Code | Where it is defined | Definition |
| --- | --- | --- |
| IRC 2009 | [Fuel Gas](https://harth.build/resources/building-codes/us-states/maryland/irc-2009/fuel-gas.md) | That which enables a device, appliance or equipmentto be directly reached, without requiring the removal or movement of any panel, door or similar obstruction. (See "Access.") |
| IMC 2009 | [Definitions](https://harth.build/resources/building-codes/us-states/new-hampshire/imc-2009/definitions.md) | That which enables a device, appliance or equipment to be directly reached, without requiring the removal or movement of any panel, door or similar obstruction [see "Access (to)"]. |

## Where ready access (to) is used in the code

The term appears in 2 chapters of the 2009 I-Codes hosted here. The chapters that lean on it hardest are the ones to read next.

| Chapter | Code | Mentions |
| --- | --- | --- |
| [Definitions](https://harth.build/resources/building-codes/us-states/new-hampshire/imc-2009/definitions.md) | IMC 2009 | 2 |
| [Fuel Gas](https://harth.build/resources/building-codes/us-states/maryland/irc-2009/fuel-gas.md) | IRC 2009 | 1 |

## Ready Access (to) compared with Ready Access

These two are the closest pair in the 2009 I-Codes: about 68 per cent of their defining words are the same. The code states both and compares neither, so the difference is worth naming.

| | Wording unique to it |
| --- | --- |
| **Ready Access (to)** (IRC 2009) | equipmentto, see, access |
| [Ready Access](https://harth.build/resources/glossary/ready-access.md) (IPC 2009) | fixture, equipment, use, ofa, portable, ladder, step, stool |

Everything else in the two definitions is shared. If a project turns on which of the two applies, those words are the whole of the test — and a local amendment that edits one of them without editing the other moves the boundary between ready access (to) and ready access.

## The terms ready access (to) is built out of

The definition above leans on 3 other defined terms. Each carries its own code definition, and a local amendment to any of them changes what ready access (to) covers:

- **[Equipment](https://harth.build/resources/glossary/equipment.md)** — IRC 2009: All piping, ducts, vents, control devices and other components of systems other than appliances that are permanently installed and integrated to provide control of environmental conditions for buildings.
- **[Appliance](https://harth.build/resources/glossary/appliance.md)** — IRC 2009: Utilization equipment, normally built in standardized sizes or types, that is installed or connected as a unit to perform one or more functions such as clothes washing, air conditioning, food mixing, deep frying, etc.
- **[Device](https://harth.build/resources/glossary/device.md)** — IRC 2009: Aunit of an electrical system that carries or controls electrical energy as it principal function.

## Ready Access (to): what to open, and in what order

Every row is a document this term depends on. The [ICC code library](https://codes.iccsafe.org/codes) and the [ICC adoption maps](https://www.iccsafe.org/advocacy/code-adoption-maps/) cover the middle rows.

| Check | Where | Confirmed |
| --- | --- | --- |
| Read the definition in the adopted IRC | Fuel Gas | |
| Read the definition in the adopted IMC | Definitions | |
| Re-check the requirement that uses it | Definitions (IMC 2009) | |
| Re-check the requirement that uses it | Fuel Gas (IRC 2009) | |
| Confirm the dependent definition | Equipment | |
| Confirm the dependent definition | Appliance | |
| Confirm the dependent definition | Device | |
| Local amendment to any of the above | Jurisdiction's amendment list | |

**A research aid, not a code determination.** The authority having jurisdiction decides which edition and which amendments apply.

## Where can you explore related guidance?

- [Explore all glossary guidance](https://harth.build/resources/glossary.md)
- [Equipment: Building Code Definition](https://harth.build/resources/glossary/equipment.md)
- [Appliance: Building Code Definition](https://harth.build/resources/glossary/appliance.md)
- [Device: Building Code Definition](https://harth.build/resources/glossary/device.md)

## Sources and method

Definitions quoted from the 2009 International Codes as transcribed in this site's building-codes collection, with the source chapter linked for each quotation. Usage counts are computed over the chapters hosted here, one copy per code. The [ICC code library](https://codes.iccsafe.org/codes) publishes the current model text and the [ICC adoption maps](https://www.iccsafe.org/advocacy/code-adoption-maps/) show which edition a jurisdiction has adopted; those sources control.

### Source links

- [codes.iccsafe.org](https://codes.iccsafe.org/codes)

- [iccsafe.org](https://www.iccsafe.org/advocacy/code-adoption-maps/)

## Frequently asked questions

### What is the code definition of ready access (to)?

The International Residential Code (IRC) 2009 defines it in Fuel Gas as: “That which enables a device, appliance or equipmentto be directly reached, without requiring the removal or movement of any panel, door or similar obstruction. (See "Access.")” The 2009 model text is reproduced here; the definition that binds your project is the one in the edition your jurisdiction has adopted, as amended locally.

### Which parts of the code depend on ready access (to)?

In this corpus the term is used across 2 chapters, led by Definitions in the IMC 2009. Those are the sections whose scope moves if the definition is amended locally, so read them together with Chapter 2 rather than on their own.

### What is the definition of a structure according to the building code?

Structure is a separate defined term. The IPC 2009 defines it as: “That which is built or constructed or a portion thereof.” That is not the same as ready access (to), which the IRC 2009 defines as “That which enables a device, appliance or equipmentto be directly reached, without requiring the removal or movement of any panel, door or similar obstruction. (See "Access.")” — read both before applying either, and confirm the wording in the edition your jurisdiction has adopted.

### What does IRC mean in building code?

Building is a separate defined term. The IBC 2009 defines it as: “Any structure used or intended for supporting or sheltering any use or occupancy.” That is not the same as ready access (to), which the IRC 2009 defines as “That which enables a device, appliance or equipmentto be directly reached, without requiring the removal or movement of any panel, door or similar obstruction. (See "Access.")” — read both before applying either, and confirm the wording in the edition your jurisdiction has adopted.

---

- Continue in Harth (open this topic in the Harth agent): https://app.harth.build/agent?context=%2Fresources%2Fglossary%2Fready-access-to%2F
- View this page in a browser: https://harth.build/resources/glossary/ready-access-to/
- All resources for agents: https://harth.build/llms.txt
