# Through Penetration: Building Code Definition

> How the IBC 2009 define through penetration, where the wording differs, and which chapters depend on the term.

- Canonical: https://harth.build/resources/glossary/through-penetration/
- Last updated: 2026-09-07
- Data source: Definitions quoted from the 2009 International Codes as transcribed in this site's building-codes collection, with the source chapter linked for each quotation. Usage counts are computed over the chapters hosted here, one copy per code. The [ICC code library](https://codes.iccsafe.org/codes) publishes the current model text and the [ICC adoption maps](https://www.iccsafe.org/advocacy/code-adoption-maps/) show which edition a jurisdiction has adopted; those sources control.

## Key facts

| Fact | Value |
| --- | --- |
| Defined in | IBC 2009 (2009 editions transcribed in this corpus) |
| Primary source | IBC 2009 Fire and Smoke Protection Features (model text, not a jurisdiction's adopted text) |
| Chapters using the term | 4 (counted across the codes hosted here) |
| Wording identical across codes | Single code (compare before citing one code's wording under another) |

## Direct answer

Through penetration is a defined term in the International Building Code (IBC) 2009, in Fire and Smoke Protection Features. The code's own words are: “An opening that passes through an entire assembly.” No other I-Code in this corpus defines it, so the IBC 2009 definition is the one to work from. The term is used in 4 chapters of this corpus, most often in Fire and Smoke Protection Features (IBC 2009), Duct Systems (IMC 2009), Building Planning (IRC 2009). These pages transcribe the 2009 model text; verify the definition against the edition and amendments your authority having jurisdiction has adopted. Record the jurisdiction, the adopted edition, the application date and any local amendment that rewrites the definition before you use it on a live project, because a term redefined by amendment changes every requirement that depends on it.

*Content and cited inputs reviewed by [Scott Barrington](https://nz.linkedin.com/in/barrington), Harth founder and architectural technology specialist · Published 2026-09-07 · Updated 2026-09-07.*

## What does this term mean?

**Through Penetration** — IBC 2009, Fire and Smoke Protection Features:

> An opening that passes through an entire assembly.

![Labeled code-term definition diagram: Through Penetration: Building Code Definition](https://efwwel0vyt9vy5so.public.blob.vercel-storage.com/images/glossary/through-penetration/diagram-1344.webp)

*How the IBC 2009 define through penetration, where the wording differs, and which chapters depend on the term.*

## What must be verified before using this guidance?

**Through Penetration** is defined once in this corpus, in the [Fire and Smoke Protection Features](https://harth.build/resources/building-codes/us-states/maryland/ibc-2009/fire-and-smoke-protection-features.md) chapter of the International Building Code (IBC) 2009:

> An opening that passes through an entire assembly.

## Where through penetration is used in the code

The term appears in 4 chapters of the 2009 I-Codes hosted here. The chapters that lean on it hardest are the ones to read next.

| Chapter | Code | Mentions |
| --- | --- | --- |
| [Fire and Smoke Protection Features](https://harth.build/resources/building-codes/us-states/maryland/ibc-2009/fire-and-smoke-protection-features.md) | IBC 2009 | 29 |
| [Duct Systems](https://harth.build/resources/building-codes/us-states/new-hampshire/imc-2009/duct-systems.md) | IMC 2009 | 5 |
| [Building Planning](https://harth.build/resources/building-codes/us-states/maryland/irc-2009/building-planning.md) | IRC 2009 | 4 |
| [Definitions](https://harth.build/resources/building-codes/us-states/maryland/ibc-2009/definitions.md) | IBC 2009 | 1 |

## Through Penetration: what to open, and in what order

Every row is a document this term depends on. The [ICC code library](https://codes.iccsafe.org/codes) and the [ICC adoption maps](https://www.iccsafe.org/advocacy/code-adoption-maps/) cover the middle rows.

| Check | Where | Confirmed |
| --- | --- | --- |
| Read the definition in the adopted IBC | Fire and Smoke Protection Features | |
| Re-check the requirement that uses it | Fire and Smoke Protection Features (IBC 2009) | |
| Re-check the requirement that uses it | Duct Systems (IMC 2009) | |
| Re-check the requirement that uses it | Building Planning (IRC 2009) | |
| Re-check the requirement that uses it | Definitions (IBC 2009) | |
| Local amendment to any of the above | Jurisdiction's amendment list | |

**A research aid, not a code determination.** The authority having jurisdiction decides which edition and which amendments apply.

## Where can you explore related guidance?

- [Explore all glossary guidance](https://harth.build/resources/glossary.md)
- [Shaft: Building Code Definition](https://harth.build/resources/glossary/shaft.md)
- [Damper: Building Code Definition](https://harth.build/resources/glossary/damper.md)
- [Fire-resistance Rating: Building Code Definition](https://harth.build/resources/glossary/fire-resistance-rating.md)
- [Fire Barrier: Building Code Definition](https://harth.build/resources/glossary/fire-barrier.md)

## Sources and method

Definitions quoted from the 2009 International Codes as transcribed in this site's building-codes collection, with the source chapter linked for each quotation. Usage counts are computed over the chapters hosted here, one copy per code. The [ICC code library](https://codes.iccsafe.org/codes) publishes the current model text and the [ICC adoption maps](https://www.iccsafe.org/advocacy/code-adoption-maps/) show which edition a jurisdiction has adopted; those sources control.

### Source links

- [codes.iccsafe.org](https://codes.iccsafe.org/codes)

- [iccsafe.org](https://www.iccsafe.org/advocacy/code-adoption-maps/)

## Frequently asked questions

### What is the code definition of through penetration?

The International Building Code (IBC) 2009 defines it in Fire and Smoke Protection Features as: “An opening that passes through an entire assembly.” The 2009 model text is reproduced here; the definition that binds your project is the one in the edition your jurisdiction has adopted, as amended locally.

### Which parts of the code depend on through penetration?

In this corpus the term is used across 4 chapters, led by Fire and Smoke Protection Features in the IBC 2009. Those are the sections whose scope moves if the definition is amended locally, so read them together with Chapter 2 rather than on their own.

### What is a through-penetration firestop system?

Through-penetration Firestop System is a separate defined term. The IBC 2009 defines it as: “An assemblage of specific materials or products that are designed, tested and fire-resistance rated to resist for a prescribed period of time the spread of fire through penetrations. The F and T Irating criteria for penetration firestop systems shall be in accordance with ASTM E …” That is not the same as through penetration, which the IBC 2009 defines as “An opening that passes through an entire assembly.” — read both before applying either, and confirm the wording in the edition your jurisdiction has adopted.

---

- Continue in Harth (open this topic in the Harth agent): https://app.harth.build/agent?context=%2Fresources%2Fglossary%2Fthrough-penetration%2F
- View this page in a browser: https://harth.build/resources/glossary/through-penetration/
- All resources for agents: https://harth.build/llms.txt
