House Construction Cost Planning: Bukit Timah, Singapore
Bukit Timah house cost planning using the World Bank ICP 2021 national construction price-level index of 97.6, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/SGP/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames SG dump](https://download.geonames.org/export/dump/SG.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1880744). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early house construction cost planning in Bukit Timah, the World Bank ICP reports a 2021 Singapore construction price-level index of 97.6, with the world equal to 100. This is a national comparison—not a Bukit Timah SGD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Singapore in 2021; it does not measure a Bukit Timah market basket or current house tenders. GeoNames 1880744 records the locality at 1.3280, 103.7910, with snapshot population 85,900. That ranks Bukit Timah 29 of 50 listed places, while Clementi Housing Estate is the nearest listed peer at about 3 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 97.6 construction index mean?
The World Bank ICP 2021 construction PLI for Singapore is 97.6, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that house work in Bukit Timah costs 0.976 times a current world rate.
Which Bukit Timah inputs are known?
The reproducible locality point is 1.3280, 103.7910 (GeoNames 1880744). Its snapshot population is 85,900, ranked 29 of 50 listed places; GeoNames classifies it as a populated place in administrative area 00. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Bukit Timah house project, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 97.6 | Retain only as dated cross-country context |
| Local SGD/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Bukit Timah comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Bukit Timah | Snapshot population | Admin area |
|---|---|---|---|
| Clementi Housing Estate | 3 | 92,420 | 00 |
| Queenstown Estate | 4 | 101,480 | 00 |
| Bukit Batok New Town | 5 | 158,030 | 00 |
| Jurong East | 6 | 72,960 | 04 |
| Novena | 6 | 53,160 | 02 |
| Bishan New Town | 7 | 87,320 | 00 |
| Kallang | 8 | 101,290 | 00 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (97.6 ÷ P). At P = 100 the dimensionless ratio is 0.976; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 97.6 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Bukit Timah adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Bukit Timah, Singapore
- School Construction Cost Planning: Bukit Timah, Singapore
- Retail Construction Cost Planning: Bukit Timah, Singapore
- House Construction Cost Planning: Clementi Housing Estate, Singapore
- All construction costs guidance for Singapore
- Sun Path: Bukit Timah, Singapore
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames SG dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1880744). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 97.6 index give a house cost per m² for Bukit Timah?
No. 97.6 is the World Bank ICP 2021 national construction price-level index for Singapore, with the world equal to 100. It is a cross-country screening statistic, not a Bukit Timah SGD/m² rate, escalation index, quote or tender estimate.
How should a Bukit Timah house estimate replace this screening benchmark?
Collect current Bukit Timah comparables on a consistent gross-floor-area basis, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- House Construction Cost Planning: Bukit Merah Estate, Singapore
Bukit Merah Estate house cost planning: World Bank ICP 2021 construction PLI 97.6 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Bukit Panjang New Town, Singapore
Bukit Panjang New Town house cost planning: World Bank ICP 2021 construction PLI 97.6 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Bukit Rahman Putra, Malaysia
Bukit Rahman Putra house cost planning: World Bank ICP 2021 construction PLI 44.5 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Bunbury, Australia
Bunbury house cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Bundaberg, Australia
Bundaberg house cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Bungoma, Kenya
Bungoma house cost planning: World Bank ICP 2021 construction PLI 64.9 (World=100), scope limits and 8 GeoNames comparison locations.