Construction Costs
House Construction Cost Planning: Jurong Town, Singapore
Jurong Town house cost planning using the World Bank ICP 2021 national construction price-level index of 97.6, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/SGP/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames SG dump](https://download.geonames.org/export/dump/SG.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1881953). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early house construction cost planning in Jurong Town, the World Bank ICP reports a 2021 Singapore construction price-level index of 97.6, with the world equal to 100. This is a national comparison—not a Jurong Town SGD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Singapore in 2021; it does not measure a Jurong Town market basket or current house tenders. GeoNames 1881953 records the locality at 1.3342, 103.7228, with snapshot population 262,730. That ranks Jurong Town 6 of 50 listed places, while Jurong West is the nearest listed peer at about 2 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 97.6 construction index mean?
The World Bank ICP 2021 construction PLI for Singapore is 97.6, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that house work in Jurong Town costs 0.976 times a current world rate.
Which Jurong Town inputs are known?
The reproducible locality point is 1.3342, 103.7228 (GeoNames 1881953). Its snapshot population is 262,730, ranked 6 of 50 listed places; GeoNames classifies it as a populated place in administrative area 05. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Jurong Town house project, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 97.6 | Retain only as dated cross-country context |
| Local SGD/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Jurong Town comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Jurong Town | Snapshot population | Admin area |
|---|---|---|---|
| Jurong West | 2 | 253,840 | 00 |
| Jurong East | 2 | 72,960 | 04 |
| Hong Kah | 3 | 26,150 | 00 |
| Boon Lay | 4 | 29,510 | 00 |
| Clementi Housing Estate | 5 | 92,420 | 00 |
| Tampines Estate | 24 | 265,340 | 00 |
| Tampines New Town | 25 | 259,900 | 00 |
| Sengkang New Town | 20 | 267,600 | 02 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (97.6 ÷ P). At P = 100 the dimensionless ratio is 0.976; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 97.6 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Jurong Town adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Jurong Town, Singapore
- School Construction Cost Planning: Jurong Town, Singapore
- Retail Construction Cost Planning: Jurong Town, Singapore
- House Construction Cost Planning: Jurong West, Singapore
- All construction costs guidance for Singapore
- Sun Path: Jurong Town, Singapore
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames SG dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1881953). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 97.6 index give a house cost per m² for Jurong Town?
No. 97.6 is the World Bank ICP 2021 national construction price-level index for Singapore, with the world equal to 100. It is a cross-country screening statistic, not a Jurong Town SGD/m² rate, escalation index, quote or tender estimate.
How should a Jurong Town house estimate replace this screening benchmark?
Collect current Jurong Town comparables on a consistent gross-floor-area basis, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- House Construction Cost Planning: Juja, Kenya
Juja house cost planning: World Bank ICP 2021 construction PLI 64.9 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Jumayrā, United Arab Emirates
Jumayrā house cost planning: World Bank ICP 2021 construction PLI 67.1 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Jurong East, Singapore
Jurong East house cost planning: World Bank ICP 2021 construction PLI 97.6 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Jurong West, Singapore
Jurong West house cost planning: World Bank ICP 2021 construction PLI 97.6 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Kaduna, Nigeria
Kaduna house cost planning: World Bank ICP 2021 construction PLI 72.8 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Kai Tak, Hong Kong SAR, China
Kai Tak house cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.