House Construction Cost Planning: Kampong Baharu Cheras Batu Sebelas, Malaysia

Kampong Baharu Cheras Batu Sebelas house cost planning using the World Bank ICP 2021 national construction price-level index of 44.5, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/MYS/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames MY dump](https://download.geonames.org/export/dump/MY.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1771298). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early house construction cost planning in Kampong Baharu Cheras Batu Sebelas, the World Bank ICP reports a 2021 Malaysia construction price-level index of 44.5, with the world equal to 100. This is a national comparison—not a Kampong Baharu Cheras Batu Sebelas MYR/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Malaysia in 2021; it does not measure a Kampong Baharu Cheras Batu Sebelas market basket or current house tenders. GeoNames 1771298 records the locality at 3.0500, 101.7667, with snapshot population 232,100. That ranks Kampong Baharu Cheras Batu Sebelas 40 of 50 listed places, while Kajang is the nearest listed peer at about 7 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 44.5 construction index mean?

The World Bank ICP 2021 construction PLI for Malaysia is 44.5, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that house work in Kampong Baharu Cheras Batu Sebelas costs 0.445 times a current world rate.

Which Kampong Baharu Cheras Batu Sebelas inputs are known?

The reproducible locality point is 3.0500, 101.7667 (GeoNames 1771298). Its snapshot population is 232,100, ranked 40 of 50 listed places; GeoNames classifies it as a section of a populated place in administrative area 12. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a Kampong Baharu Cheras Batu Sebelas house project, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 44.5Retain only as dated cross-country context
Local MYR/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

Kampong Baharu Cheras Batu Sebelas comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from Kampong Baharu Cheras Batu SebelasSnapshot populationAdmin area
Kajang7236,24012
Kuala Lumpur131,453,97514
Wangsa Maju17215,60014
Puchong18375,18112
Bandar Sunway18200,00012
Teluk Intan136232,80007
Pasir Mas336230,42403
Paya Terubong306226,71209

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (44.5 ÷ P). At P = 100 the dimensionless ratio is 0.445; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI44.5 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local Kampong Baharu Cheras Batu Sebelas adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames MY dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1771298). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 44.5 index give a house cost per m² for Kampong Baharu Cheras Batu Sebelas?

No. 44.5 is the World Bank ICP 2021 national construction price-level index for Malaysia, with the world equal to 100. It is a cross-country screening statistic, not a Kampong Baharu Cheras Batu Sebelas MYR/m² rate, escalation index, quote or tender estimate.

How should a Kampong Baharu Cheras Batu Sebelas house estimate replace this screening benchmark?

Collect current Kampong Baharu Cheras Batu Sebelas comparables on a consistent gross-floor-area basis, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.