Construction Costs
House Construction Cost Planning: Werribee, Australia
Werribee house cost planning using the World Bank ICP 2021 national construction price-level index of 264.1, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/AUS/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames AU dump](https://download.geonames.org/export/dump/AU.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2144095). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early house construction cost planning in Werribee, the World Bank ICP reports a 2021 Australia construction price-level index of 264.1, with the world equal to 100. This is a national comparison—not a Werribee AUD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Australia in 2021; it does not measure a Werribee market basket or current house tenders. GeoNames 2144095 records the locality at -37.9000, 144.6667, with snapshot population 50,027. That ranks Werribee 44 of 50 listed places, while Tarneit is the nearest listed peer at about 7 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 264.1 construction index mean?
The World Bank ICP 2021 construction PLI for Australia is 264.1, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that house work in Werribee costs 2.641 times a current world rate.
Which Werribee inputs are known?
The reproducible locality point is -37.9000, 144.6667 (GeoNames 2144095). Its snapshot population is 50,027, ranked 44 of 50 listed places; GeoNames classifies it as a section of a populated place in administrative area 07. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Werribee house project, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 264.1 | Retain only as dated cross-country context |
| Local AUD/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Werribee comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Werribee | Snapshot population | Admin area |
|---|---|---|---|
| Tarneit | 7 | 56,370 | 07 |
| Point Cook | 8 | 66,781 | 07 |
| City of Port Phillip | 25 | 112,669 | 07 |
| Melbourne | 28 | 5,435,590 | 07 |
| Melbourne City Centre | 28 | 60,057 | 07 |
| Berwick | 62 | 50,298 | 07 |
| Reservoir | 36 | 51,096 | 07 |
| Port Macquarie | 1,041 | 51,965 | 02 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (264.1 ÷ P). At P = 100 the dimensionless ratio is 2.641; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 264.1 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Werribee adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Werribee, Australia
- School Construction Cost Planning: Werribee, Australia
- Retail Construction Cost Planning: Werribee, Australia
- House Construction Cost Planning: Tarneit, Australia
- All construction costs guidance for Australia
- Daylight & Orientation: Werribee, Australia
- Solar Altitude & Azimuth: Werribee, Australia
- Solar Shading Design: Werribee, Australia
- Sun Path: Werribee, Australia
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames AU dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2144095). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 264.1 index give a house cost per m² for Werribee?
No. 264.1 is the World Bank ICP 2021 national construction price-level index for Australia, with the world equal to 100. It is a cross-country screening statistic, not a Werribee AUD/m² rate, escalation index, quote or tender estimate.
How should a Werribee house estimate replace this screening benchmark?
Collect current Werribee comparables on a consistent gross-floor-area basis, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- House Construction Cost Planning: Waterford, Ireland
Waterford house cost planning: World Bank ICP 2021 construction PLI 152.8 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Welkom, South Africa
Welkom house cost planning: World Bank ICP 2021 construction PLI 71.3 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Wellington, New Zealand
Wellington house cost planning: World Bank ICP 2021 construction PLI 362.0 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Wexford, Ireland
Wexford house cost planning: World Bank ICP 2021 construction PLI 152.8 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Whampoa, Hong Kong SAR, China
Whampoa house cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Whanganui, New Zealand
Whanganui house cost planning: World Bank ICP 2021 construction PLI 362.0 (World=100), scope limits and 8 GeoNames comparison locations.