Office Construction Cost Planning: Celbridge, Ireland

Celbridge office cost planning using the World Bank ICP 2021 national construction price-level index of 152.8, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/IRL/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames IE dump](https://download.geonames.org/export/dump/IE.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2965529). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early office construction cost planning in Celbridge, the World Bank ICP reports a 2021 Ireland construction price-level index of 152.8, with the world equal to 100. This is a national comparison—not a Celbridge EUR/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Ireland in 2021; it does not measure a Celbridge market basket or current office tenders. GeoNames 2965529 records the locality at 53.3417, -6.5442, with snapshot population 20,288. That ranks Celbridge 30 of 50 listed places, while Leixlip is the nearest listed peer at about 4 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 152.8 construction index mean?

The World Bank ICP 2021 construction PLI for Ireland is 152.8, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that office work in Celbridge costs 1.528 times a current world rate.

Which Celbridge inputs are known?

The reproducible locality point is 53.3417, -6.5442 (GeoNames 2965529). Its snapshot population is 20,288, ranked 30 of 50 listed places; GeoNames classifies it as a populated place in administrative area L. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a Celbridge office project, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 152.8Retain only as dated cross-country context
Local EUR/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

Celbridge comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from CelbridgeSnapshot populationAdmin area
Leixlip415,504L
Maynooth617,259L
Lucan715,269L
Clondalkin1014,508L
Blanchardstown1216,511L
Sligo16320,608C
Naas1620,713L
Finglas1719,768L

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (152.8 ÷ P). At P = 100 the dimensionless ratio is 1.528; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI152.8 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local Celbridge adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames IE dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2965529). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 152.8 index give a office cost per m² for Celbridge?

No. 152.8 is the World Bank ICP 2021 national construction price-level index for Ireland, with the world equal to 100. It is a cross-country screening statistic, not a Celbridge EUR/m² rate, escalation index, quote or tender estimate.

How should a Celbridge office estimate replace this screening benchmark?

Collect current Celbridge comparables on a consistent gross-floor-area basis, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.