Construction Costs
Office Construction Cost Planning: Pok Fu Lam, Hong Kong SAR, China
Pok Fu Lam office cost planning using the World Bank ICP 2021 national construction price-level index of 141.8, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/HKG/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames HK dump](https://download.geonames.org/export/dump/HK.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1819091). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early office construction cost planning in Pok Fu Lam, the World Bank ICP reports a 2021 Hong Kong SAR, China construction price-level index of 141.8, with the world equal to 100. This is a national comparison—not a Pok Fu Lam HKD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Hong Kong SAR, China in 2021; it does not measure a Pok Fu Lam market basket or current office tenders. GeoNames 1819091 records the locality at 22.2686, 114.1292, with snapshot population 77,100. That ranks Pok Fu Lam 29 of 50 listed places, while Kennedy Town is the nearest listed peer at about 2 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 141.8 construction index mean?
The World Bank ICP 2021 construction PLI for Hong Kong SAR, China is 141.8, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that office work in Pok Fu Lam costs 1.418 times a current world rate.
Which Pok Fu Lam inputs are known?
The reproducible locality point is 22.2686, 114.1292 (GeoNames 1819091). Its snapshot population is 77,100, ranked 29 of 50 listed places; GeoNames classifies it as a populated place in administrative area HSO. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Pok Fu Lam office project, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 141.8 | Retain only as dated cross-country context |
| Local HKD/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Pok Fu Lam comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Pok Fu Lam | Snapshot population | Admin area |
|---|---|---|---|
| Kennedy Town | 2 | 38,000 | HCW |
| Victoria | 3 | 956,800 | HCW |
| Aberdeen | 3 | 157,400 | HSO |
| Wan Chai | 5 | 166,695 | HWC |
| Hong Kong | 5 | 7,396,076 | not stated |
| Shap Pat Heung | 20 | 77,775 | NYL |
| Nam Cheong | 7 | 74,780 | KSS |
| Kowloon West End | 9 | 74,710 | KKC |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (141.8 ÷ P). At P = 100 the dimensionless ratio is 1.418; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 141.8 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Pok Fu Lam adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- House Construction Cost Planning: Pok Fu Lam, Hong Kong SAR, China
- School Construction Cost Planning: Pok Fu Lam, Hong Kong SAR, China
- Retail Construction Cost Planning: Pok Fu Lam, Hong Kong SAR, China
- Office Construction Cost Planning: Kennedy Town, Hong Kong SAR, China
- All construction costs guidance for Hong Kong
- Daylight & Orientation: Pok Fu Lam, Hong Kong
- Solar Altitude & Azimuth: Pok Fu Lam, Hong Kong
- Solar Shading Design: Pok Fu Lam, Hong Kong
- Sun Path: Pok Fu Lam, Hong Kong
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames HK dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1819091). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 141.8 index give a office cost per m² for Pok Fu Lam?
No. 141.8 is the World Bank ICP 2021 national construction price-level index for Hong Kong SAR, China, with the world equal to 100. It is a cross-country screening statistic, not a Pok Fu Lam HKD/m² rate, escalation index, quote or tender estimate.
How should a Pok Fu Lam office estimate replace this screening benchmark?
Collect current Pok Fu Lam comparables on a consistent gross-floor-area basis, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- Office Construction Cost Planning: Pittwater, Australia
Pittwater office cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Plymouth, United Kingdom
Plymouth office cost planning: World Bank ICP 2021 construction PLI 155.3 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Point Cook, Australia
Point Cook office cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Polokwane, South Africa
Polokwane office cost planning: World Bank ICP 2021 construction PLI 71.3 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Porirua, New Zealand
Porirua office cost planning: World Bank ICP 2021 construction PLI 362.0 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Port Harcourt, Nigeria
Port Harcourt office cost planning: World Bank ICP 2021 construction PLI 72.8 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.