Office Construction Cost Planning: Selayang Baru Utara, Malaysia
Selayang Baru Utara office cost planning using the World Bank ICP 2021 national construction price-level index of 44.5, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/MYS/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames MY dump](https://download.geonames.org/export/dump/MY.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 7795834). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early office construction cost planning in Selayang Baru Utara, the World Bank ICP reports a 2021 Malaysia construction price-level index of 44.5, with the world equal to 100. This is a national comparison—not a Selayang Baru Utara MYR/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Malaysia in 2021; it does not measure a Selayang Baru Utara market basket or current office tenders. GeoNames 7795834 records the locality at 3.2549, 101.6668, with snapshot population 542,409. That ranks Selayang Baru Utara 16 of 50 listed places, while Batu Caves is the nearest listed peer at about 3 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 44.5 construction index mean?
The World Bank ICP 2021 construction PLI for Malaysia is 44.5, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that office work in Selayang Baru Utara costs 0.445 times a current world rate.
Which Selayang Baru Utara inputs are known?
The reproducible locality point is 3.2549, 101.6668 (GeoNames 7795834). Its snapshot population is 542,409, ranked 16 of 50 listed places; GeoNames classifies it as a populated place in administrative area 12. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Selayang Baru Utara office project, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 44.5 | Retain only as dated cross-country context |
| Local MYR/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Selayang Baru Utara comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Selayang Baru Utara | Snapshot population | Admin area |
|---|---|---|---|
| Batu Caves | 3 | 254,083 | 12 |
| Taman Petaling | 6 | 423,062 | 14 |
| Setapak | 9 | 353,268 | 12 |
| Wangsa Maju | 10 | 215,600 | 14 |
| Bukit Rahman Putra | 12 | 607,000 | 12 |
| Sungai Petani | 296 | 544,851 | 02 |
| Kota Kuala Muda | 297 | 544,984 | 02 |
| Kuantan | 194 | 548,014 | 06 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (44.5 ÷ P). At P = 100 the dimensionless ratio is 0.445; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 44.5 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Selayang Baru Utara adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- House Construction Cost Planning: Selayang Baru Utara, Malaysia
- School Construction Cost Planning: Selayang Baru Utara, Malaysia
- Retail Construction Cost Planning: Selayang Baru Utara, Malaysia
- Office Construction Cost Planning: Batu Caves, Malaysia
- All construction costs guidance for Malaysia
- Climate Design Data: Selayang Baru Utara, Malaysia
- Daylight & Orientation: Selayang Baru Utara, Malaysia
- Solar Altitude & Azimuth: Selayang Baru Utara, Malaysia
- Solar Shading Design: Selayang Baru Utara, Malaysia
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames MY dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 7795834). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 44.5 index give a office cost per m² for Selayang Baru Utara?
No. 44.5 is the World Bank ICP 2021 national construction price-level index for Malaysia, with the world equal to 100. It is a cross-country screening statistic, not a Selayang Baru Utara MYR/m² rate, escalation index, quote or tender estimate.
How should a Selayang Baru Utara office estimate replace this screening benchmark?
Collect current Selayang Baru Utara comparables on a consistent gross-floor-area basis, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- Office Construction Cost Planning: Santol, Philippines
Santol office cost planning: World Bank ICP 2021 construction PLI 49.3 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Saskatoon, Canada
Saskatoon office cost planning: World Bank ICP 2021 construction PLI 217.0 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Sau Mau Ping, Hong Kong SAR, China
Sau Mau Ping office cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Sembawang Estate, Singapore
Sembawang Estate office cost planning: World Bank ICP 2021 construction PLI 97.6 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Sengkang New Town, Singapore
Sengkang New Town office cost planning: World Bank ICP 2021 construction PLI 97.6 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Serangoon Garden, Singapore
Serangoon Garden office cost planning: World Bank ICP 2021 construction PLI 97.6 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.