Construction Costs
Office Construction Cost Planning: Templeogue, Ireland
Templeogue office cost planning using the World Bank ICP 2021 national construction price-level index of 152.8, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/IRL/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames IE dump](https://download.geonames.org/export/dump/IE.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 3315404). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early office construction cost planning in Templeogue, the World Bank ICP reports a 2021 Ireland construction price-level index of 152.8, with the world equal to 100. This is a national comparison—not a Templeogue EUR/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Ireland in 2021; it does not measure a Templeogue market basket or current office tenders. GeoNames 3315404 records the locality at 53.2953, -6.3089, with snapshot population 18,076. That ranks Templeogue 35 of 50 listed places, while Rathfarnham is the nearest listed peer at about 2 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 152.8 construction index mean?
The World Bank ICP 2021 construction PLI for Ireland is 152.8, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that office work in Templeogue costs 1.528 times a current world rate.
Which Templeogue inputs are known?
The reproducible locality point is 53.2953, -6.3089 (GeoNames 3315404). Its snapshot population is 18,076, ranked 35 of 50 listed places; GeoNames classifies it as a section of a populated place in administrative area L. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Templeogue office project, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 152.8 | Retain only as dated cross-country context |
| Local EUR/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Templeogue comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Templeogue | Snapshot population | Admin area |
|---|---|---|---|
| Rathfarnham | 2 | 17,333 | L |
| Knocklyon | 2 | 14,628 | L |
| South Dublin | 2 | 301,075 | L |
| Tallaght | 4 | 81,022 | L |
| Dublin | 6 | 1,024,027 | L |
| Carrigaline | 217 | 18,239 | M |
| Cluain Meala | 140 | 18,369 | M |
| Ballincollig | 220 | 18,621 | M |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (152.8 ÷ P). At P = 100 the dimensionless ratio is 1.528; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 152.8 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Templeogue adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- House Construction Cost Planning: Templeogue, Ireland
- School Construction Cost Planning: Templeogue, Ireland
- Retail Construction Cost Planning: Templeogue, Ireland
- Office Construction Cost Planning: Rathfarnham, Ireland
- All construction costs guidance for Ireland
- Daylight & Orientation: Templeogue, Ireland
- Solar Altitude & Azimuth: Templeogue, Ireland
- Solar Shading Design: Templeogue, Ireland
- Sun Path: Templeogue, Ireland
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames IE dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 3315404). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 152.8 index give a office cost per m² for Templeogue?
No. 152.8 is the World Bank ICP 2021 national construction price-level index for Ireland, with the world equal to 100. It is a cross-country screening statistic, not a Templeogue EUR/m² rate, escalation index, quote or tender estimate.
How should a Templeogue office estimate replace this screening benchmark?
Collect current Templeogue comparables on a consistent gross-floor-area basis, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- Office Construction Cost Planning: Tauranga, New Zealand
Tauranga office cost planning: World Bank ICP 2021 construction PLI 362.0 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Tawau, Malaysia
Tawau office cost planning: World Bank ICP 2021 construction PLI 44.5 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Teluk Intan, Malaysia
Teluk Intan office cost planning: World Bank ICP 2021 construction PLI 44.5 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Thāne, India
Thāne office cost planning: World Bank ICP 2021 construction PLI 37.7 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Thembisa, South Africa
Thembisa office cost planning: World Bank ICP 2021 construction PLI 71.3 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Thika, Kenya
Thika office cost planning: World Bank ICP 2021 construction PLI 64.9 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.