Office Construction Cost Planning: Villeray–Saint-Michel–Parc-Extension, Canada

Villeray–Saint-Michel–Parc-Extension office cost planning using the World Bank ICP 2021 national construction price-level index of 217.0, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/CAN/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames CA dump](https://download.geonames.org/export/dump/CA.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 13546324). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early office construction cost planning in Villeray–Saint-Michel–Parc-Extension, the World Bank ICP reports a 2021 Canada construction price-level index of 217.0, with the world equal to 100. This is a national comparison—not a Villeray–Saint-Michel–Parc-Extension CAD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Canada in 2021; it does not measure a Villeray–Saint-Michel–Parc-Extension market basket or current office tenders. GeoNames 13546324 records the locality at 45.5587, -73.6054, with snapshot population 144,814. That ranks Villeray–Saint-Michel–Parc-Extension 40 of 50 listed places, while Rosemont–La Petite-Patrie is the nearest listed peer at about 2 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 217.0 construction index mean?

The World Bank ICP 2021 construction PLI for Canada is 217.0, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that office work in Villeray–Saint-Michel–Parc-Extension costs 2.170 times a current world rate.

Which Villeray–Saint-Michel–Parc-Extension inputs are known?

The reproducible locality point is 45.5587, -73.6054 (GeoNames 13546324). Its snapshot population is 144,814, ranked 40 of 50 listed places; GeoNames classifies it as a fourth-order administrative seat in administrative area 10. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a Villeray–Saint-Michel–Parc-Extension office project, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 217.0Retain only as dated cross-country context
Local CAD/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

Villeray–Saint-Michel–Parc-Extension comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from Villeray–Saint-Michel–Parc-ExtensionSnapshot populationAdmin area
Rosemont–La Petite-Patrie2146,50110
Mercier–Hochelaga-Maisonneuve5142,75310
Ahuntsic-Cartierville5135,33610
Montréal61,762,94910
Laval7438,36610
Kelowna3,411144,57602
Trois-Rivières120144,47210
Guelph572143,74008

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (217.0 ÷ P). At P = 100 the dimensionless ratio is 2.170; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI217.0 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local Villeray–Saint-Michel–Parc-Extension adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames CA dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 13546324). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 217.0 index give a office cost per m² for Villeray–Saint-Michel–Parc-Extension?

No. 217.0 is the World Bank ICP 2021 national construction price-level index for Canada, with the world equal to 100. It is a cross-country screening statistic, not a Villeray–Saint-Michel–Parc-Extension CAD/m² rate, escalation index, quote or tender estimate.

How should a Villeray–Saint-Michel–Parc-Extension office estimate replace this screening benchmark?

Collect current Villeray–Saint-Michel–Parc-Extension comparables on a consistent gross-floor-area basis, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.