School Construction Cost Planning: Ang Mo Kio New Town, Singapore
Ang Mo Kio New Town school cost planning using the World Bank ICP 2021 national construction price-level index of 97.6, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/SGP/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames SG dump](https://download.geonames.org/export/dump/SG.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1884365). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early school construction cost planning in Ang Mo Kio New Town, the World Bank ICP reports a 2021 Singapore construction price-level index of 97.6, with the world equal to 100. This is a national comparison—not a Ang Mo Kio New Town SGD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Singapore in 2021; it does not measure a Ang Mo Kio New Town market basket or current school tenders. GeoNames 1884365 records the locality at 1.3803, 103.8397, with snapshot population 159,340. That ranks Ang Mo Kio New Town 14 of 50 listed places, while Yio Chu Kang is the nearest listed peer at about 2 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 97.6 construction index mean?
The World Bank ICP 2021 construction PLI for Singapore is 97.6, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that school work in Ang Mo Kio New Town costs 0.976 times a current world rate.
Which Ang Mo Kio New Town inputs are known?
The reproducible locality point is 1.3803, 103.8397 (GeoNames 1884365). Its snapshot population is 159,340, ranked 14 of 50 listed places; GeoNames classifies it as a populated place in administrative area 02. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Ang Mo Kio New Town school project, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 97.6 | Retain only as dated cross-country context |
| Local SGD/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Ang Mo Kio New Town comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Ang Mo Kio New Town | Snapshot population | Admin area |
|---|---|---|---|
| Yio Chu Kang | 2 | 28,350 | 00 |
| Serangoon Garden | 3 | 36,080 | 00 |
| Bishan New Town | 3 | 87,320 | 00 |
| Thomson | 3 | 29,390 | 00 |
| Serangoon New Town | 5 | 116,900 | 00 |
| Bukit Batok New Town | 9 | 158,030 | 00 |
| Bukit Merah Estate | 11 | 151,250 | 00 |
| Kampong Pasir Ris | 10 | 144,260 | 00 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (97.6 ÷ P). At P = 100 the dimensionless ratio is 0.976; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 97.6 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Ang Mo Kio New Town adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Ang Mo Kio New Town, Singapore
- House Construction Cost Planning: Ang Mo Kio New Town, Singapore
- Retail Construction Cost Planning: Ang Mo Kio New Town, Singapore
- School Construction Cost Planning: Serangoon Garden, Singapore
- All construction costs guidance for Singapore
- Sun Path: Ang Mo Kio New Town, Singapore
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames SG dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1884365). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 97.6 index give a school cost per m² for Ang Mo Kio New Town?
No. 97.6 is the World Bank ICP 2021 national construction price-level index for Singapore, with the world equal to 100. It is a cross-country screening statistic, not a Ang Mo Kio New Town SGD/m² rate, escalation index, quote or tender estimate.
How should a Ang Mo Kio New Town school estimate replace this screening benchmark?
Collect current Ang Mo Kio New Town comparables on a consistent gross-floor-area basis, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- School Construction Cost Planning: Alor Setar, Malaysia
Alor Setar school cost planning: World Bank ICP 2021 construction PLI 44.5 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Amritsar, India
Amritsar school cost planning: World Bank ICP 2021 construction PLI 37.7 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: An Muileann gCearr, Ireland
An Muileann gCearr school cost planning: World Bank ICP 2021 construction PLI 152.8 (World=100), scope limits and 7 GeoNames comparison locations.
- School Construction Cost Planning: Angeles City, Philippines
Angeles City school cost planning: World Bank ICP 2021 construction PLI 49.3 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Antipolo, Philippines
Antipolo school cost planning: World Bank ICP 2021 construction PLI 49.3 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Ţarīf Kalbā, United Arab Emirates
Ţarīf Kalbā school cost planning: World Bank ICP 2021 construction PLI 67.1 (World=100), scope limits and 8 GeoNames comparison locations.