Construction Costs
School Construction Cost Planning: Ar Rāshidīyah, United Arab Emirates
Ar Rāshidīyah school cost planning using the World Bank ICP 2021 national construction price-level index of 67.1, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/ARE/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames AE dump](https://download.geonames.org/export/dump/AE.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 291061). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early school construction cost planning in Ar Rāshidīyah, the World Bank ICP reports a 2021 United Arab Emirates construction price-level index of 67.1, with the world equal to 100. This is a national comparison—not a Ar Rāshidīyah AED/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across United Arab Emirates in 2021; it does not measure a Ar Rāshidīyah market basket or current school tenders. GeoNames 291061 records the locality at 25.2250, 55.3895, with snapshot population 38,425. That ranks Ar Rāshidīyah 41 of 50 listed places, while Mirdif is the nearest listed peer at about 2 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 67.1 construction index mean?
The World Bank ICP 2021 construction PLI for United Arab Emirates is 67.1, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that school work in Ar Rāshidīyah costs 0.671 times a current world rate.
Which Ar Rāshidīyah inputs are known?
The reproducible locality point is 25.2250, 55.3895 (GeoNames 291061). Its snapshot population is 38,425, ranked 41 of 50 listed places; GeoNames classifies it as a section of a populated place in administrative area 03. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Ar Rāshidīyah school project, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 67.1 | Retain only as dated cross-country context |
| Local AED/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Ar Rāshidīyah comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Ar Rāshidīyah | Snapshot population | Admin area |
|---|---|---|---|
| Mirdif | 2 | 60,288 | 03 |
| Dubai Festival City | 3 | 77,000 | 03 |
| Al Warqaa | 5 | 59,111 | 03 |
| Al Qusais 1 | 6 | 48,378 | 03 |
| Warīsān | 7 | 108,759 | 03 |
| Jumayrā | 14 | 39,080 | 03 |
| Kalbā | 99 | 37,545 | 06 |
| Khawr Fakkān | 97 | 40,677 | 06 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (67.1 ÷ P). At P = 100 the dimensionless ratio is 0.671; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 67.1 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Ar Rāshidīyah adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Ar Rāshidīyah, United Arab Emirates
- House Construction Cost Planning: Ar Rāshidīyah, United Arab Emirates
- Retail Construction Cost Planning: Ar Rāshidīyah, United Arab Emirates
- School Construction Cost Planning: Mirdif, United Arab Emirates
- All construction costs guidance for United Arab Emirates
- Climate Design Data: Ar Rāshidīyah, UAE
- Daylight & Orientation: Ar Rāshidīyah, UAE
- Solar Altitude & Azimuth: Ar Rāshidīyah, UAE
- Solar Shading Design: Ar Rāshidīyah, UAE
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames AE dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 291061). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 67.1 index give a school cost per m² for Ar Rāshidīyah?
No. 67.1 is the World Bank ICP 2021 national construction price-level index for United Arab Emirates, with the world equal to 100. It is a cross-country screening statistic, not a Ar Rāshidīyah AED/m² rate, escalation index, quote or tender estimate.
How should a Ar Rāshidīyah school estimate replace this screening benchmark?
Collect current Ar Rāshidīyah comparables on a consistent gross-floor-area basis, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- School Construction Cost Planning: Angeles City, Philippines
Angeles City school cost planning: World Bank ICP 2021 construction PLI 49.3 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Antipolo, Philippines
Antipolo school cost planning: World Bank ICP 2021 construction PLI 49.3 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Ţarīf Kalbā, United Arab Emirates
Ţarīf Kalbā school cost planning: World Bank ICP 2021 construction PLI 67.1 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Ar Rumaylah, United Arab Emirates
Ar Rumaylah school cost planning: World Bank ICP 2021 construction PLI 67.1 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Archway, United Kingdom
Archway school cost planning: World Bank ICP 2021 construction PLI 155.3 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: As Saţwah, United Arab Emirates
As Saţwah school cost planning: World Bank ICP 2021 construction PLI 67.1 (World=100), scope limits and 7 GeoNames comparison locations.
The AI-powered workspace for architects.