School Construction Cost Planning: Jordan, Hong Kong SAR, China

Jordan school cost planning using the World Bank ICP 2021 national construction price-level index of 141.8, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/HKG/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames HK dump](https://download.geonames.org/export/dump/HK.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 8224045). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early school construction cost planning in Jordan, the World Bank ICP reports a 2021 Hong Kong SAR, China construction price-level index of 141.8, with the world equal to 100. This is a national comparison—not a Jordan HKD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Hong Kong SAR, China in 2021; it does not measure a Jordan market basket or current school tenders. GeoNames 8224045 records the locality at 22.3054, 114.1700, with snapshot population 41,537. That ranks Jordan 40 of 50 listed places, while Mong Kok is the nearest listed peer at about 2 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 141.8 construction index mean?

The World Bank ICP 2021 construction PLI for Hong Kong SAR, China is 141.8, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that school work in Jordan costs 1.418 times a current world rate.

Which Jordan inputs are known?

The reproducible locality point is 22.3054, 114.1700 (GeoNames 8224045). Its snapshot population is 41,537, ranked 40 of 50 listed places; GeoNames classifies it as a populated place in administrative area KYT. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a Jordan school project, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 141.8Retain only as dated cross-country context
Local HKD/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

Jordan comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from JordanSnapshot populationAdmin area
Mong Kok262,967KYT
Kowloon22,232,33900
Whampoa239,134KKC
Wan Chai3166,695HWC
Sham Shui Po3431,090KSS
Kai Tak442,552KKC
Pat Heung1840,357NYL
Choi Wan538,405KWT

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (141.8 ÷ P). At P = 100 the dimensionless ratio is 1.418; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI141.8 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local Jordan adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames HK dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 8224045). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 141.8 index give a school cost per m² for Jordan?

No. 141.8 is the World Bank ICP 2021 national construction price-level index for Hong Kong SAR, China, with the world equal to 100. It is a cross-country screening statistic, not a Jordan HKD/m² rate, escalation index, quote or tender estimate.

How should a Jordan school estimate replace this screening benchmark?

Collect current Jordan comparables on a consistent gross-floor-area basis, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.