School Construction Cost Planning: Kallang, Singapore
Kallang school cost planning using the World Bank ICP 2021 national construction price-level index of 97.6, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/SGP/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames SG dump](https://download.geonames.org/export/dump/SG.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1880628). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early school construction cost planning in Kallang, the World Bank ICP reports a 2021 Singapore construction price-level index of 97.6, with the world equal to 100. This is a national comparison—not a Kallang SGD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Singapore in 2021; it does not measure a Kallang market basket or current school tenders. GeoNames 1880628 records the locality at 1.3333, 103.8667, with snapshot population 101,290. That ranks Kallang 26 of 50 listed places, while Toa Payoh New Town is the nearest listed peer at about 2 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 97.6 construction index mean?
The World Bank ICP 2021 construction PLI for Singapore is 97.6, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that school work in Kallang costs 0.976 times a current world rate.
Which Kallang inputs are known?
The reproducible locality point is 1.3333, 103.8667 (GeoNames 1880628). Its snapshot population is 101,290, ranked 26 of 50 listed places; GeoNames classifies it as a section of a populated place in administrative area 00. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Kallang school project, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 97.6 | Retain only as dated cross-country context |
| Local SGD/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Kallang comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Kallang | Snapshot population | Admin area |
|---|---|---|---|
| Toa Payoh New Town | 2 | 120,650 | 00 |
| Serangoon New Town | 2 | 116,900 | 00 |
| MacPherson | 2 | 26,850 | 01 |
| Geylang | 3 | 110,201 | 00 |
| Bishan New Town | 3 | 87,320 | 00 |
| Queenstown Estate | 8 | 101,480 | 00 |
| Sembawang Estate | 14 | 110,090 | 00 |
| Clementi Housing Estate | 11 | 92,420 | 00 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (97.6 ÷ P). At P = 100 the dimensionless ratio is 0.976; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 97.6 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Kallang adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Kallang, Singapore
- House Construction Cost Planning: Kallang, Singapore
- Retail Construction Cost Planning: Kallang, Singapore
- School Construction Cost Planning: Toa Payoh New Town, Singapore
- All construction costs guidance for Singapore
- Sun Path: Kallang, Singapore
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames SG dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1880628). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 97.6 index give a school cost per m² for Kallang?
No. 97.6 is the World Bank ICP 2021 national construction price-level index for Singapore, with the world equal to 100. It is a cross-country screening statistic, not a Kallang SGD/m² rate, escalation index, quote or tender estimate.
How should a Kallang school estimate replace this screening benchmark?
Collect current Kallang comparables on a consistent gross-floor-area basis, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- School Construction Cost Planning: Kaki Bukit Estate, Singapore
Kaki Bukit Estate school cost planning: World Bank ICP 2021 construction PLI 97.6 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Kalbā, United Arab Emirates
Kalbā school cost planning: World Bank ICP 2021 construction PLI 67.1 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Kallakurichi, India
Kallakurichi school cost planning: World Bank ICP 2021 construction PLI 37.7 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Kalyān, India
Kalyān school cost planning: World Bank ICP 2021 construction PLI 37.7 (World=100), scope limits and 7 GeoNames comparison locations.
- School Construction Cost Planning: Kampong Baharu Cheras Batu Sebelas, Malaysia
Kampong Baharu Cheras Batu Sebelas school cost planning: World Bank ICP 2021 construction PLI 44.5 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Kampong Pasir Ris, Singapore
Kampong Pasir Ris school cost planning: World Bank ICP 2021 construction PLI 97.6 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.