School Construction Cost Planning: Shah Alam, Malaysia

Shah Alam school cost planning using the World Bank ICP 2021 national construction price-level index of 44.5, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/MYS/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames MY dump](https://download.geonames.org/export/dump/MY.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1732903). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early school construction cost planning in Shah Alam, the World Bank ICP reports a 2021 Malaysia construction price-level index of 44.5, with the world equal to 100. This is a national comparison—not a Shah Alam MYR/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Malaysia in 2021; it does not measure a Shah Alam market basket or current school tenders. GeoNames 1732903 records the locality at 3.0851, 101.5328, with snapshot population 740,750. That ranks Shah Alam 6 of 50 listed places, while Subang Jaya is the nearest listed peer at about 7 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 44.5 construction index mean?

The World Bank ICP 2021 construction PLI for Malaysia is 44.5, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that school work in Shah Alam costs 0.445 times a current world rate.

Which Shah Alam inputs are known?

The reproducible locality point is 3.0851, 101.5328 (GeoNames 1732903). Its snapshot population is 740,750, ranked 6 of 50 listed places; GeoNames classifies it as a populated place in administrative area 12. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a Shah Alam school project, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 44.5Retain only as dated cross-country context
Local MYR/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

Shah Alam comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from Shah AlamSnapshot populationAdmin area
Subang Jaya7708,29612
Kampung Baru Subang7833,57112
Bandar Sunway8200,00012
Petaling Jaya9807,87912
Kota Damansara9500,00012
Ipoh174759,95207

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (44.5 ÷ P). At P = 100 the dimensionless ratio is 0.445; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI44.5 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local Shah Alam adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames MY dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1732903). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 44.5 index give a school cost per m² for Shah Alam?

No. 44.5 is the World Bank ICP 2021 national construction price-level index for Malaysia, with the world equal to 100. It is a cross-country screening statistic, not a Shah Alam MYR/m² rate, escalation index, quote or tender estimate.

How should a Shah Alam school estimate replace this screening benchmark?

Collect current Shah Alam comparables on a consistent gross-floor-area basis, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.