Construction Costs
School Construction Cost Planning: Sungai Petani, Malaysia
Sungai Petani school cost planning using the World Bank ICP 2021 national construction price-level index of 44.5, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/MYS/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames MY dump](https://download.geonames.org/export/dump/MY.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1735498). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early school construction cost planning in Sungai Petani, the World Bank ICP reports a 2021 Malaysia construction price-level index of 44.5, with the world equal to 100. This is a national comparison—not a Sungai Petani MYR/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Malaysia in 2021; it does not measure a Sungai Petani market basket or current school tenders. GeoNames 1735498 records the locality at 5.6470, 100.4877, with snapshot population 544,851. That ranks Sungai Petani 15 of 50 listed places, while Kota Kuala Muda is the nearest listed peer at about 14 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 44.5 construction index mean?
The World Bank ICP 2021 construction PLI for Malaysia is 44.5, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that school work in Sungai Petani costs 0.445 times a current world rate.
Which Sungai Petani inputs are known?
The reproducible locality point is 5.6470, 100.4877 (GeoNames 1735498). Its snapshot population is 544,851, ranked 15 of 50 listed places; GeoNames classifies it as a populated place in administrative area 02. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Sungai Petani school project, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 44.5 | Retain only as dated cross-country context |
| Local MYR/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Sungai Petani comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Sungai Petani | Snapshot population | Admin area |
|---|---|---|---|
| Kota Kuala Muda | 14 | 544,984 | 02 |
| Bukit Mertajam | 32 | 212,329 | 09 |
| Paya Terubong | 38 | 226,712 | 09 |
| Alor Setar | 55 | 417,800 | 02 |
| Taiping | 93 | 217,647 | 07 |
| Selayang Baru Utara | 296 | 542,409 | 12 |
| Kuantan | 375 | 548,014 | 06 |
| Pasir Gudang | 600 | 534,659 | 01 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (44.5 ÷ P). At P = 100 the dimensionless ratio is 0.445; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 44.5 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Sungai Petani adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Sungai Petani, Malaysia
- House Construction Cost Planning: Sungai Petani, Malaysia
- Retail Construction Cost Planning: Sungai Petani, Malaysia
- School Construction Cost Planning: Kota Kuala Muda, Malaysia
- All construction costs guidance for Malaysia
- Climate Design Data: Sungai Petani, Malaysia
- Daylight & Orientation: Sungai Petani, Malaysia
- Solar Altitude & Azimuth: Sungai Petani, Malaysia
- Solar Shading Design: Sungai Petani, Malaysia
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames MY dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1735498). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 44.5 index give a school cost per m² for Sungai Petani?
No. 44.5 is the World Bank ICP 2021 national construction price-level index for Malaysia, with the world equal to 100. It is a cross-country screening statistic, not a Sungai Petani MYR/m² rate, escalation index, quote or tender estimate.
How should a Sungai Petani school estimate replace this screening benchmark?
Collect current Sungai Petani comparables on a consistent gross-floor-area basis, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- School Construction Cost Planning: Stoke-on-Trent, United Kingdom
Stoke-on-Trent school cost planning: World Bank ICP 2021 construction PLI 155.3 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Subang Jaya, Malaysia
Subang Jaya school cost planning: World Bank ICP 2021 construction PLI 44.5 (World=100), scope limits and 7 GeoNames comparison locations.
- School Construction Cost Planning: Sungai Buloh, Malaysia
Sungai Buloh school cost planning: World Bank ICP 2021 construction PLI 44.5 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Sunshine Coast, Australia
Sunshine Coast school cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Surat, India
Surat school cost planning: World Bank ICP 2021 construction PLI 37.7 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Surrey, Canada
Surrey school cost planning: World Bank ICP 2021 construction PLI 217.0 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.