Construction Costs
Office Construction Cost Planning: Pelentong, Malaysia
Pelentong office cost planning using the World Bank ICP 2021 national construction price-level index of 44.5, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/MYS/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames MY dump](https://download.geonames.org/export/dump/MY.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1732747). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early office construction cost planning in Pelentong, the World Bank ICP reports a 2021 Malaysia construction price-level index of 44.5, with the world equal to 100. This is a national comparison—not a Pelentong MYR/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Malaysia in 2021; it does not measure a Pelentong market basket or current office tenders. GeoNames 1732747 records the locality at 1.5243, 103.8240, with snapshot population 583,640. That ranks Pelentong 9 of 50 listed places, while Bandar Seri Alam is the nearest listed peer at about 6 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 44.5 construction index mean?
The World Bank ICP 2021 construction PLI for Malaysia is 44.5, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that office work in Pelentong costs 0.445 times a current world rate.
Which Pelentong inputs are known?
The reproducible locality point is 1.5243, 103.8240 (GeoNames 1732747). Its snapshot population is 583,640, ranked 9 of 50 listed places; GeoNames classifies it as a populated place in administrative area 01. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Pelentong office project, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 44.5 | Retain only as dated cross-country context |
| Local MYR/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Pelentong comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Pelentong | Snapshot population | Admin area |
|---|---|---|---|
| Bandar Seri Alam | 6 | 220,000 | 01 |
| Kampung Kangkar Teberau | 8 | 412,373 | 01 |
| Kampung Larkin Lama | 9 | 500,000 | 01 |
| Johor Bahru | 10 | 858,118 | 01 |
| Pasir Gudang | 11 | 534,659 | 01 |
| Malacca | 191 | 579,000 | 04 |
| Iskandar Puteri | 27 | 575,977 | 01 |
| Kota Bharu | 541 | 568,900 | 03 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (44.5 ÷ P). At P = 100 the dimensionless ratio is 0.445; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 44.5 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Pelentong adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- House Construction Cost Planning: Pelentong, Malaysia
- School Construction Cost Planning: Pelentong, Malaysia
- Retail Construction Cost Planning: Pelentong, Malaysia
- Office Construction Cost Planning: Bandar Seri Alam, Malaysia
- All construction costs guidance for Malaysia
- Daylight & Orientation: Pelentong, Malaysia
- Solar Altitude & Azimuth: Pelentong, Malaysia
- Solar Shading Design: Pelentong, Malaysia
- Sun Path: Pelentong, Malaysia
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames MY dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1732747). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 44.5 index give a office cost per m² for Pelentong?
No. 44.5 is the World Bank ICP 2021 national construction price-level index for Malaysia, with the world equal to 100. It is a cross-country screening statistic, not a Pelentong MYR/m² rate, escalation index, quote or tender estimate.
How should a Pelentong office estimate replace this screening benchmark?
Collect current Pelentong comparables on a consistent gross-floor-area basis, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- Office Construction Cost Planning: Pat Heung, Hong Kong SAR, China
Pat Heung office cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Patna, India
Patna office cost planning: World Bank ICP 2021 construction PLI 37.7 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Paya Terubong, Malaysia
Paya Terubong office cost planning: World Bank ICP 2021 construction PLI 44.5 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Peng Siang, Singapore
Peng Siang office cost planning: World Bank ICP 2021 construction PLI 97.6 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Perth, Australia
Perth office cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Petaling Jaya, Malaysia
Petaling Jaya office cost planning: World Bank ICP 2021 construction PLI 44.5 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.