Construction Costs
Office Construction Cost Planning: Paya Terubong, Malaysia
Paya Terubong office cost planning using the World Bank ICP 2021 national construction price-level index of 44.5, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/MYS/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames MY dump](https://download.geonames.org/export/dump/MY.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 13100478). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early office construction cost planning in Paya Terubong, the World Bank ICP reports a 2021 Malaysia construction price-level index of 44.5, with the world equal to 100. This is a national comparison—not a Paya Terubong MYR/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Malaysia in 2021; it does not measure a Paya Terubong market basket or current office tenders. GeoNames 13100478 records the locality at 5.3728, 100.2797, with snapshot population 226,712. That ranks Paya Terubong 42 of 50 listed places, while Bukit Mertajam is the nearest listed peer at about 21 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 44.5 construction index mean?
The World Bank ICP 2021 construction PLI for Malaysia is 44.5, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that office work in Paya Terubong costs 0.445 times a current world rate.
Which Paya Terubong inputs are known?
The reproducible locality point is 5.3728, 100.2797 (GeoNames 13100478). Its snapshot population is 226,712, ranked 42 of 50 listed places; GeoNames classifies it as a populated place in administrative area 09. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Paya Terubong office project, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 44.5 | Retain only as dated cross-country context |
| Local MYR/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Paya Terubong comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Paya Terubong | Snapshot population | Admin area |
|---|---|---|---|
| Bukit Mertajam | 21 | 212,329 | 09 |
| Kota Kuala Muda | 26 | 544,984 | 02 |
| Sungai Petani | 38 | 544,851 | 02 |
| Taiping | 77 | 217,647 | 07 |
| Alor Setar | 84 | 417,800 | 02 |
| Pasir Mas | 219 | 230,424 | 03 |
| Sungai Buloh | 279 | 222,858 | 12 |
| Kampong Baharu Cheras Batu Sebelas | 306 | 232,100 | 12 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (44.5 ÷ P). At P = 100 the dimensionless ratio is 0.445; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 44.5 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Paya Terubong adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- House Construction Cost Planning: Paya Terubong, Malaysia
- School Construction Cost Planning: Paya Terubong, Malaysia
- Retail Construction Cost Planning: Paya Terubong, Malaysia
- Office Construction Cost Planning: Kota Kuala Muda, Malaysia
- All construction costs guidance for Malaysia
- Climate Design Data: Paya Terubong, Malaysia
- Sun Path: Paya Terubong, Malaysia
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames MY dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 13100478). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 44.5 index give a office cost per m² for Paya Terubong?
No. 44.5 is the World Bank ICP 2021 national construction price-level index for Malaysia, with the world equal to 100. It is a cross-country screening statistic, not a Paya Terubong MYR/m² rate, escalation index, quote or tender estimate.
How should a Paya Terubong office estimate replace this screening benchmark?
Collect current Paya Terubong comparables on a consistent gross-floor-area basis, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- Office Construction Cost Planning: Pasir Ris New Town, Singapore
Pasir Ris New Town office cost planning: World Bank ICP 2021 construction PLI 97.6 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Pat Heung, Hong Kong SAR, China
Pat Heung office cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Patna, India
Patna office cost planning: World Bank ICP 2021 construction PLI 37.7 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Pelentong, Malaysia
Pelentong office cost planning: World Bank ICP 2021 construction PLI 44.5 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Peng Siang, Singapore
Peng Siang office cost planning: World Bank ICP 2021 construction PLI 97.6 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Perth, Australia
Perth office cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.