Retail Construction Cost Planning: Paya Terubong, Malaysia

Paya Terubong retail cost planning using the World Bank ICP 2021 national construction price-level index of 44.5, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/MYS/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames MY dump](https://download.geonames.org/export/dump/MY.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 13100478). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early retail construction cost planning in Paya Terubong, the World Bank ICP reports a 2021 Malaysia construction price-level index of 44.5, with the world equal to 100. This is a national comparison—not a Paya Terubong MYR/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Malaysia in 2021; it does not measure a Paya Terubong market basket or current retail tenders. GeoNames 13100478 records the locality at 5.3728, 100.2797, with snapshot population 226,712. That ranks Paya Terubong 42 of 50 listed places, while Bukit Mertajam is the nearest listed peer at about 21 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 44.5 construction index mean?

The World Bank ICP 2021 construction PLI for Malaysia is 44.5, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that retail work in Paya Terubong costs 0.445 times a current world rate.

Which Paya Terubong inputs are known?

The reproducible locality point is 5.3728, 100.2797 (GeoNames 13100478). Its snapshot population is 226,712, ranked 42 of 50 listed places; GeoNames classifies it as a populated place in administrative area 09. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a Paya Terubong retail project, reconcile shell condition, tenant fit-out, servicing, trading constraints and landlord works. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 44.5Retain only as dated cross-country context
Local MYR/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

Paya Terubong comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from Paya TerubongSnapshot populationAdmin area
Bukit Mertajam21212,32909
Kota Kuala Muda26544,98402
Sungai Petani38544,85102
Taiping77217,64707
Alor Setar84417,80002
Pasir Mas219230,42403
Sungai Buloh279222,85812
Kampong Baharu Cheras Batu Sebelas306232,10012

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (44.5 ÷ P). At P = 100 the dimensionless ratio is 0.445; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI44.5 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local Paya Terubong adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames MY dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 13100478). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 44.5 index give a retail cost per m² for Paya Terubong?

No. 44.5 is the World Bank ICP 2021 national construction price-level index for Malaysia, with the world equal to 100. It is a cross-country screening statistic, not a Paya Terubong MYR/m² rate, escalation index, quote or tender estimate.

How should a Paya Terubong retail estimate replace this screening benchmark?

Collect current Paya Terubong comparables on a consistent gross-floor-area basis, reconcile shell condition, tenant fit-out, servicing, trading constraints and landlord works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.