Retail Construction Cost Planning: Alor Setar, Malaysia
Alor Setar retail cost planning using the World Bank ICP 2021 national construction price-level index of 44.5, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/MYS/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames MY dump](https://download.geonames.org/export/dump/MY.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1736309). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early retail construction cost planning in Alor Setar, the World Bank ICP reports a 2021 Malaysia construction price-level index of 44.5, with the world equal to 100. This is a national comparison—not a Alor Setar MYR/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Malaysia in 2021; it does not measure a Alor Setar market basket or current retail tenders. GeoNames 1736309 records the locality at 6.1210, 100.3601, with snapshot population 417,800. That ranks Alor Setar 25 of 50 listed places, while Sungai Petani is the nearest listed peer at about 55 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Harth team · Published 2026-08-26 · Updated 2026-09-15.
What does the 44.5 construction index mean?
The World Bank ICP 2021 construction PLI for Malaysia is 44.5, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that retail work in Alor Setar costs 0.445 times a current world rate.
Which Alor Setar inputs are known?
The reproducible locality point is 6.1210, 100.3601 (GeoNames 1736309). Its snapshot population is 417,800, ranked 25 of 50 listed places; GeoNames classifies it as a first-order administrative seat in administrative area 02. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Alor Setar retail project, reconcile shell condition, tenant fit-out, servicing, trading constraints and landlord works. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 44.5 | Retain only as dated cross-country context |
| Local MYR/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Alor Setar comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Alor Setar | Snapshot population | Admin area |
|---|---|---|---|
| Sungai Petani | 55 | 544,851 | 02 |
| Kota Kuala Muda | 59 | 544,984 | 02 |
| Paya Terubong | 84 | 226,712 | 09 |
| Bukit Mertajam | 85 | 212,329 | 09 |
| Taiping | 147 | 217,647 | 07 |
| Taman Petaling | 355 | 423,062 | 14 |
| Kampung Kangkar Teberau | 634 | 412,373 | 01 |
| Kuala Terengganu | 320 | 426,500 | 13 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (44.5 ÷ P). At P = 100 the dimensionless ratio is 0.445; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 44.5 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Alor Setar adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Alor Setar, Malaysia
- House Construction Cost Planning: Alor Setar, Malaysia
- School Construction Cost Planning: Alor Setar, Malaysia
- Office Construction Cost Planning: Kuching, Malaysia
- House Construction Cost Planning: Kuching, Malaysia
- School Construction Cost Planning: Kuching, Malaysia
- Retail Construction Cost Planning: Kuching, Malaysia
- Office Construction Cost Planning: Seremban, Malaysia
- House Construction Cost Planning: Seremban, Malaysia
- School Construction Cost Planning: Seremban, Malaysia
- Retail Construction Cost Planning: Seremban, Malaysia
- Office Construction Cost Planning: Tawau, Malaysia
- House Construction Cost Planning: Tawau, Malaysia
- School Construction Cost Planning: Tawau, Malaysia
- Retail Construction Cost Planning: Tawau, Malaysia
- Office Construction Cost Planning: Kluang, Malaysia
- House Construction Cost Planning: Kluang, Malaysia
- School Construction Cost Planning: Kluang, Malaysia
- Retail Construction Cost Planning: Kluang, Malaysia
- Office Construction Cost Planning: Muar, Malaysia
- House Construction Cost Planning: Muar, Malaysia
- School Construction Cost Planning: Muar, Malaysia
- Retail Construction Cost Planning: Muar, Malaysia
- Office Construction Cost Planning: Miri, Malaysia
- House Construction Cost Planning: Miri, Malaysia
- School Construction Cost Planning: Miri, Malaysia
- Retail Construction Cost Planning: Miri, Malaysia
- Office Construction Cost Planning: Kapar, Malaysia
- House Construction Cost Planning: Kapar, Malaysia
- School Construction Cost Planning: Kapar, Malaysia
- Retail Construction Cost Planning: Kapar, Malaysia
- Office Construction Cost Planning: Teluk Intan, Malaysia
- House Construction Cost Planning: Teluk Intan, Malaysia
- School Construction Cost Planning: Teluk Intan, Malaysia
- Retail Construction Cost Planning: Teluk Intan, Malaysia
- Office Construction Cost Planning: Pasir Mas, Malaysia
- House Construction Cost Planning: Pasir Mas, Malaysia
- School Construction Cost Planning: Pasir Mas, Malaysia
- Retail Construction Cost Planning: Pasir Mas, Malaysia
- Office Construction Cost Planning: Taiping, Malaysia
- House Construction Cost Planning: Taiping, Malaysia
- School Construction Cost Planning: Taiping, Malaysia
- Retail Construction Cost Planning: Taiping, Malaysia
- Office Construction Cost Planning: Kuala Lumpur, Malaysia
- House Construction Cost Planning: Kuala Lumpur, Malaysia
- School Construction Cost Planning: Kuala Lumpur, Malaysia
- Retail Construction Cost Planning: Kuala Lumpur, Malaysia
- Office Construction Cost Planning: Johor Bahru, Malaysia
- House Construction Cost Planning: Johor Bahru, Malaysia
- School Construction Cost Planning: Johor Bahru, Malaysia
- Retail Construction Cost Planning: Johor Bahru, Malaysia
- Office Construction Cost Planning: Ipoh, Malaysia
- House Construction Cost Planning: Ipoh, Malaysia
- School Construction Cost Planning: Ipoh, Malaysia
- Retail Construction Cost Planning: Ipoh, Malaysia
- Office Construction Cost Planning: Malacca, Malaysia
- House Construction Cost Planning: Malacca, Malaysia
- School Construction Cost Planning: Malacca, Malaysia
- Retail Construction Cost Planning: Malacca, Malaysia
- Office Construction Cost Planning: Kota Bharu, Malaysia
- House Construction Cost Planning: Kota Bharu, Malaysia
- School Construction Cost Planning: Kota Bharu, Malaysia
- Retail Construction Cost Planning: Kota Bharu, Malaysia
- Office Construction Cost Planning: Kuantan, Malaysia
- House Construction Cost Planning: Kuantan, Malaysia
- School Construction Cost Planning: Kuantan, Malaysia
- Retail Construction Cost Planning: Kuantan, Malaysia
- Office Construction Cost Planning: Kota Kuala Muda, Malaysia
- House Construction Cost Planning: Kota Kuala Muda, Malaysia
- School Construction Cost Planning: Kota Kuala Muda, Malaysia
- Retail Construction Cost Planning: Kota Kuala Muda, Malaysia
- Office Construction Cost Planning: Kota Kinabalu, Malaysia
- House Construction Cost Planning: Kota Kinabalu, Malaysia
- School Construction Cost Planning: Kota Kinabalu, Malaysia
- Retail Construction Cost Planning: Kota Kinabalu, Malaysia
- Office Construction Cost Planning: Sandakan, Malaysia
- House Construction Cost Planning: Sandakan, Malaysia
- School Construction Cost Planning: Sandakan, Malaysia
- Retail Construction Cost Planning: Sandakan, Malaysia
- Office Construction Cost Planning: Kuala Terengganu, Malaysia
- House Construction Cost Planning: Kuala Terengganu, Malaysia
- School Construction Cost Planning: Kuala Terengganu, Malaysia
- Retail Construction Cost Planning: Kuala Terengganu, Malaysia
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames MY dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1736309). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 44.5 index give a retail cost per m² for Alor Setar?
No. 44.5 is the World Bank ICP 2021 national construction price-level index for Malaysia, with the world equal to 100. It is a cross-country screening statistic, not a Alor Setar MYR/m² rate, escalation index, quote or tender estimate.
How should a Alor Setar retail estimate replace this screening benchmark?
Collect current Alor Setar comparables on a consistent gross-floor-area basis, reconcile shell condition, tenant fit-out, servicing, trading constraints and landlord works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- Construction Costs: Australia
Australia construction costs for architects: 32 city pages with reproducible location records and source paths.
- Construction Costs: Canada
Canada construction costs for architects: 25 city pages with reproducible location records and source paths.
- Construction Costs: Hong Kong
Hong Kong construction costs for architects: 2 city pages, each with a reproducible location record and source path.
- House Construction Cost Planning: Aba, Nigeria
Aba house cost planning: World Bank ICP 2021 construction PLI 72.8 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Abeokuta, Nigeria
Abeokuta house cost planning: World Bank ICP 2021 construction PLI 72.8 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Aberdeen, United Kingdom
Aberdeen house cost planning: World Bank ICP 2021 construction PLI 155.3 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.