Construction Costs
School Construction Cost Planning: Teluk Intan, Malaysia
Teluk Intan school cost planning using the World Bank ICP 2021 national construction price-level index of 44.5, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/MYS/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames MY dump](https://download.geonames.org/export/dump/MY.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1735459). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early school construction cost planning in Teluk Intan, the World Bank ICP reports a 2021 Malaysia construction price-level index of 44.5, with the world equal to 100. This is a national comparison—not a Teluk Intan MYR/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Malaysia in 2021; it does not measure a Teluk Intan market basket or current school tenders. GeoNames 1735459 records the locality at 4.0222, 101.0208, with snapshot population 232,800. That ranks Teluk Intan 39 of 50 listed places, while Ipoh is the nearest listed peer at about 63 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 44.5 construction index mean?
The World Bank ICP 2021 construction PLI for Malaysia is 44.5, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that school work in Teluk Intan costs 0.445 times a current world rate.
Which Teluk Intan inputs are known?
The reproducible locality point is 4.0222, 101.0208 (GeoNames 1735459). Its snapshot population is 232,800, ranked 39 of 50 listed places; GeoNames classifies it as a populated place in administrative area 07. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Teluk Intan school project, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 44.5 | Retain only as dated cross-country context |
| Local MYR/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Teluk Intan comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Teluk Intan | Snapshot population | Admin area |
|---|---|---|---|
| Ipoh | 63 | 759,952 | 07 |
| Taiping | 97 | 217,647 | 07 |
| Kapar | 107 | 269,627 | 12 |
| Bukit Rahman Putra | 108 | 607,000 | 12 |
| Sungai Buloh | 108 | 222,858 | 12 |
| Kampong Baharu Cheras Batu Sebelas | 136 | 232,100 | 12 |
| Pasir Mas | 257 | 230,424 | 03 |
| Kajang | 143 | 236,240 | 12 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (44.5 ÷ P). At P = 100 the dimensionless ratio is 0.445; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 44.5 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Teluk Intan adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Teluk Intan, Malaysia
- House Construction Cost Planning: Teluk Intan, Malaysia
- Retail Construction Cost Planning: Teluk Intan, Malaysia
- School Construction Cost Planning: Ipoh, Malaysia
- All construction costs guidance for Malaysia
- Climate Design Data: Teluk Intan, Malaysia
- Sun Path: Teluk Intan, Malaysia
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames MY dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1735459). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 44.5 index give a school cost per m² for Teluk Intan?
No. 44.5 is the World Bank ICP 2021 national construction price-level index for Malaysia, with the world equal to 100. It is a cross-country screening statistic, not a Teluk Intan MYR/m² rate, escalation index, quote or tender estimate.
How should a Teluk Intan school estimate replace this screening benchmark?
Collect current Teluk Intan comparables on a consistent gross-floor-area basis, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- School Construction Cost Planning: Taupo, New Zealand
Taupo school cost planning: World Bank ICP 2021 construction PLI 362.0 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Tauranga, New Zealand
Tauranga school cost planning: World Bank ICP 2021 construction PLI 362.0 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Tawau, Malaysia
Tawau school cost planning: World Bank ICP 2021 construction PLI 44.5 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Templeogue, Ireland
Templeogue school cost planning: World Bank ICP 2021 construction PLI 152.8 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Thāne, India
Thāne school cost planning: World Bank ICP 2021 construction PLI 37.7 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Thembisa, South Africa
Thembisa school cost planning: World Bank ICP 2021 construction PLI 71.3 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.