School Construction Cost Planning: Kota Bharu, Malaysia

Kota Bharu school cost planning using the World Bank ICP 2021 national construction price-level index of 44.5, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/MYS/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames MY dump](https://download.geonames.org/export/dump/MY.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1736376). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early school construction cost planning in Kota Bharu, the World Bank ICP reports a 2021 Malaysia construction price-level index of 44.5, with the world equal to 100. This is a national comparison—not a Kota Bharu MYR/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Malaysia in 2021; it does not measure a Kota Bharu market basket or current school tenders. GeoNames 1736376 records the locality at 6.1236, 102.2433, with snapshot population 568,900. That ranks Kota Bharu 12 of 50 listed places, while Pasir Mas is the nearest listed peer at about 14 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 44.5 construction index mean?

The World Bank ICP 2021 construction PLI for Malaysia is 44.5, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that school work in Kota Bharu costs 0.445 times a current world rate.

Which Kota Bharu inputs are known?

The reproducible locality point is 6.1236, 102.2433 (GeoNames 1736376). Its snapshot population is 568,900, ranked 12 of 50 listed places; GeoNames classifies it as a first-order administrative seat in administrative area 03. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a Kota Bharu school project, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 44.5Retain only as dated cross-country context
Local MYR/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

Kota Bharu comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from Kota BharuSnapshot populationAdmin area
Pasir Mas14230,42403
Kuala Terengganu133426,50013
Sungai Petani201544,85102
Alor Setar208417,80002
Bukit Mertajam214212,32909
Iskandar Puteri548575,97701
Malacca437579,00004
Pelentong541583,64001

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (44.5 ÷ P). At P = 100 the dimensionless ratio is 0.445; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI44.5 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local Kota Bharu adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames MY dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1736376). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 44.5 index give a school cost per m² for Kota Bharu?

No. 44.5 is the World Bank ICP 2021 national construction price-level index for Malaysia, with the world equal to 100. It is a cross-country screening statistic, not a Kota Bharu MYR/m² rate, escalation index, quote or tender estimate.

How should a Kota Bharu school estimate replace this screening benchmark?

Collect current Kota Bharu comparables on a consistent gross-floor-area basis, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.