Office Construction Cost Planning: Wan Chai, Hong Kong SAR, China
Wan Chai office cost planning using the World Bank ICP 2021 national construction price-level index of 141.8, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/HKG/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames HK dump](https://download.geonames.org/export/dump/HK.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1818379). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early office construction cost planning in Wan Chai, the World Bank ICP reports a 2021 Hong Kong SAR, China construction price-level index of 141.8, with the world equal to 100. This is a national comparison—not a Wan Chai HKD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Hong Kong SAR, China in 2021; it does not measure a Wan Chai market basket or current office tenders. GeoNames 1818379 records the locality at 22.2814, 114.1726, with snapshot population 166,695. That ranks Wan Chai 23 of 50 listed places, while Hong Kong is the nearest listed peer at about 0 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 141.8 construction index mean?
The World Bank ICP 2021 construction PLI for Hong Kong SAR, China is 141.8, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that office work in Wan Chai costs 1.418 times a current world rate.
Which Wan Chai inputs are known?
The reproducible locality point is 22.2814, 114.1726 (GeoNames 1818379). Its snapshot population is 166,695, ranked 23 of 50 listed places; GeoNames classifies it as a first-order administrative seat in administrative area HWC. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Wan Chai office project, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 141.8 | Retain only as dated cross-country context |
| Local HKD/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Wan Chai comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Wan Chai | Snapshot population | Admin area |
|---|---|---|---|
| Hong Kong | 0 | 7,396,076 | not stated |
| Hong Kong Island | 2 | 1,195,529 | 00 |
| Jordan | 3 | 41,537 | KYT |
| Victoria | 3 | 956,800 | HCW |
| Whampoa | 3 | 39,134 | KKC |
| Yuen Long Kau Hui | 24 | 169,600 | NYL |
| Aberdeen | 4 | 157,400 | HSO |
| Tsing Yi Town | 11 | 182,100 | NKT |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (141.8 ÷ P). At P = 100 the dimensionless ratio is 1.418; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 141.8 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Wan Chai adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- House Construction Cost Planning: Wan Chai, Hong Kong SAR, China
- School Construction Cost Planning: Wan Chai, Hong Kong SAR, China
- Retail Construction Cost Planning: Wan Chai, Hong Kong SAR, China
- Office Construction Cost Planning: Hong Kong, Hong Kong SAR, China
- All construction costs guidance for Hong Kong
- Daylight & Orientation: Wan Chai, Hong Kong
- Solar Altitude & Azimuth: Wan Chai, Hong Kong
- Solar Shading Design: Wan Chai, Hong Kong
- Sun Path: Wan Chai, Hong Kong
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames HK dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1818379). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 141.8 index give a office cost per m² for Wan Chai?
No. 141.8 is the World Bank ICP 2021 national construction price-level index for Hong Kong SAR, China, with the world equal to 100. It is a cross-country screening statistic, not a Wan Chai HKD/m² rate, escalation index, quote or tender estimate.
How should a Wan Chai office estimate replace this screening benchmark?
Collect current Wan Chai comparables on a consistent gross-floor-area basis, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- Office Construction Cost Planning: Virār, India
Virār office cost planning: World Bank ICP 2021 construction PLI 37.7 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Wainuiomata, New Zealand
Wainuiomata office cost planning: World Bank ICP 2021 construction PLI 362.0 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Wajir, Kenya
Wajir office cost planning: World Bank ICP 2021 construction PLI 64.9 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Warīsān, United Arab Emirates
Warīsān office cost planning: World Bank ICP 2021 construction PLI 67.1 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Warri, Nigeria
Warri office cost planning: World Bank ICP 2021 construction PLI 72.8 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Waterford, Ireland
Waterford office cost planning: World Bank ICP 2021 construction PLI 152.8 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.