Construction Costs
Office Construction Cost Planning: Warri, Nigeria
Warri office cost planning using the World Bank ICP 2021 national construction price-level index of 72.8, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/NGA/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames NG dump](https://download.geonames.org/export/dump/NG.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2319133). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early office construction cost planning in Warri, the World Bank ICP reports a 2021 Nigeria construction price-level index of 72.8, with the world equal to 100. This is a national comparison—not a Warri NGN/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Nigeria in 2021; it does not measure a Warri market basket or current office tenders. GeoNames 2319133 records the locality at 5.5174, 5.7501, with snapshot population 910,000. That ranks Warri 16 of 50 listed places, while Yenagoa is the nearest listed peer at about 87 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 72.8 construction index mean?
The World Bank ICP 2021 construction PLI for Nigeria is 72.8, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that office work in Warri costs 0.728 times a current world rate.
Which Warri inputs are known?
The reproducible locality point is 5.5174, 5.7501 (GeoNames 2319133). Its snapshot population is 910,000, ranked 16 of 50 listed places; GeoNames classifies it as a second-order administrative seat in administrative area 36. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Warri office project, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 72.8 | Retain only as dated cross-country context |
| Local NGN/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Warri comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Warri | Snapshot population | Admin area |
|---|---|---|---|
| Yenagoa | 87 | 365,000 | 52 |
| Benin City | 92 | 1,782,000 | 37 |
| Onitsha | 134 | 1,553,000 | 25 |
| Owerri | 142 | 545,000 | 28 |
| Port Harcourt | 162 | 2,120,000 | 50 |
| Enugu | 219 | 950,000 | 47 |
| Zaria | 659 | 980,000 | 23 |
| Jos | 600 | 1,040,000 | 49 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (72.8 ÷ P). At P = 100 the dimensionless ratio is 0.728; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 72.8 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Warri adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- House Construction Cost Planning: Warri, Nigeria
- School Construction Cost Planning: Warri, Nigeria
- Retail Construction Cost Planning: Warri, Nigeria
- Office Construction Cost Planning: Yenagoa, Nigeria
- All construction costs guidance for Nigeria
- Climate Design Data: Warri, Nigeria
- Sun Path: Warri, Nigeria
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames NG dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2319133). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 72.8 index give a office cost per m² for Warri?
No. 72.8 is the World Bank ICP 2021 national construction price-level index for Nigeria, with the world equal to 100. It is a cross-country screening statistic, not a Warri NGN/m² rate, escalation index, quote or tender estimate.
How should a Warri office estimate replace this screening benchmark?
Collect current Warri comparables on a consistent gross-floor-area basis, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- Office Construction Cost Planning: Wajir, Kenya
Wajir office cost planning: World Bank ICP 2021 construction PLI 64.9 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Wan Chai, Hong Kong SAR, China
Wan Chai office cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Warīsān, United Arab Emirates
Warīsān office cost planning: World Bank ICP 2021 construction PLI 67.1 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Waterford, Ireland
Waterford office cost planning: World Bank ICP 2021 construction PLI 152.8 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Welkom, South Africa
Welkom office cost planning: World Bank ICP 2021 construction PLI 71.3 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Wellington, New Zealand
Wellington office cost planning: World Bank ICP 2021 construction PLI 362.0 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.