House Construction Cost Planning: Warri, Nigeria

Warri house cost planning using the World Bank ICP 2021 national construction price-level index of 72.8, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/NGA/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames NG dump](https://download.geonames.org/export/dump/NG.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2319133). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early house construction cost planning in Warri, the World Bank ICP reports a 2021 Nigeria construction price-level index of 72.8, with the world equal to 100. This is a national comparison—not a Warri NGN/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Nigeria in 2021; it does not measure a Warri market basket or current house tenders. GeoNames 2319133 records the locality at 5.5174, 5.7501, with snapshot population 910,000. That ranks Warri 16 of 50 listed places, while Yenagoa is the nearest listed peer at about 87 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 72.8 construction index mean?

The World Bank ICP 2021 construction PLI for Nigeria is 72.8, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that house work in Warri costs 0.728 times a current world rate.

Which Warri inputs are known?

The reproducible locality point is 5.5174, 5.7501 (GeoNames 2319133). Its snapshot population is 910,000, ranked 16 of 50 listed places; GeoNames classifies it as a second-order administrative seat in administrative area 36. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a Warri house project, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 72.8Retain only as dated cross-country context
Local NGN/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

Warri comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from WarriSnapshot populationAdmin area
Yenagoa87365,00052
Benin City921,782,00037
Onitsha1341,553,00025
Owerri142545,00028
Port Harcourt1622,120,00050
Enugu219950,00047
Zaria659980,00023
Jos6001,040,00049

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (72.8 ÷ P). At P = 100 the dimensionless ratio is 0.728; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI72.8 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local Warri adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames NG dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2319133). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 72.8 index give a house cost per m² for Warri?

No. 72.8 is the World Bank ICP 2021 national construction price-level index for Nigeria, with the world equal to 100. It is a cross-country screening statistic, not a Warri NGN/m² rate, escalation index, quote or tender estimate.

How should a Warri house estimate replace this screening benchmark?

Collect current Warri comparables on a consistent gross-floor-area basis, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.