School Construction Cost Planning: Ping Shan, Hong Kong SAR, China
Ping Shan school cost planning using the World Bank ICP 2021 national construction price-level index of 141.8, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/HKG/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames HK dump](https://download.geonames.org/export/dump/HK.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1819101). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early school construction cost planning in Ping Shan, the World Bank ICP reports a 2021 Hong Kong SAR, China construction price-level index of 141.8, with the world equal to 100. This is a national comparison—not a Ping Shan HKD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Hong Kong SAR, China in 2021; it does not measure a Ping Shan market basket or current school tenders. GeoNames 1819101 records the locality at 22.4411, 114.0061, with snapshot population 45,400. That ranks Ping Shan 38 of 50 listed places, while Tin Shui Wai is the nearest listed peer at about 2 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 141.8 construction index mean?
The World Bank ICP 2021 construction PLI for Hong Kong SAR, China is 141.8, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that school work in Ping Shan costs 1.418 times a current world rate.
Which Ping Shan inputs are known?
The reproducible locality point is 22.4411, 114.0061 (GeoNames 1819101). Its snapshot population is 45,400, ranked 38 of 50 listed places; GeoNames classifies it as a populated place in administrative area NYL. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Ping Shan school project, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 141.8 | Retain only as dated cross-country context |
| Local HKD/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Ping Shan comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Ping Shan | Snapshot population | Admin area |
|---|---|---|---|
| Tin Shui Wai | 2 | 286,232 | NYL |
| Yuen Long | 2 | 200,000 | NYL |
| Yuen Long Kau Hui | 3 | 169,600 | NYL |
| Yuen Long San Hui | 3 | 200,000 | NYL |
| Shap Pat Heung | 4 | 77,775 | NYL |
| Mei Foo | 18 | 45,990 | KSS |
| Kai Tak | 24 | 42,552 | KKC |
| Jordan | 23 | 41,537 | KYT |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (141.8 ÷ P). At P = 100 the dimensionless ratio is 1.418; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 141.8 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Ping Shan adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Ping Shan, Hong Kong SAR, China
- House Construction Cost Planning: Ping Shan, Hong Kong SAR, China
- Retail Construction Cost Planning: Ping Shan, Hong Kong SAR, China
- School Construction Cost Planning: Tin Shui Wai, Hong Kong SAR, China
- All construction costs guidance for Hong Kong
- Climate Design Data: Ping Shan, Hong Kong
- Daylight & Orientation: Ping Shan, Hong Kong
- Solar Altitude & Azimuth: Ping Shan, Hong Kong
- Solar Shading Design: Ping Shan, Hong Kong
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames HK dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1819101). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 141.8 index give a school cost per m² for Ping Shan?
No. 141.8 is the World Bank ICP 2021 national construction price-level index for Hong Kong SAR, China, with the world equal to 100. It is a cross-country screening statistic, not a Ping Shan HKD/m² rate, escalation index, quote or tender estimate.
How should a Ping Shan school estimate replace this screening benchmark?
Collect current Ping Shan comparables on a consistent gross-floor-area basis, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- School Construction Cost Planning: Pietermaritzburg, South Africa
Pietermaritzburg school cost planning: World Bank ICP 2021 construction PLI 71.3 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Pimpri-Chinchwad, India
Pimpri-Chinchwad school cost planning: World Bank ICP 2021 construction PLI 37.7 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Pimpri, India
Pimpri school cost planning: World Bank ICP 2021 construction PLI 37.7 (World=100), scope limits and 7 GeoNames comparison locations.
- School Construction Cost Planning: Pittwater, Australia
Pittwater school cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Plymouth, United Kingdom
Plymouth school cost planning: World Bank ICP 2021 construction PLI 155.3 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Point Cook, Australia
Point Cook school cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.