Construction Costs
School Construction Cost Planning: Point Cook, Australia
Point Cook school cost planning using the World Bank ICP 2021 national construction price-level index of 264.1, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/AUS/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames AU dump](https://download.geonames.org/export/dump/AU.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2152819). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early school construction cost planning in Point Cook, the World Bank ICP reports a 2021 Australia construction price-level index of 264.1, with the world equal to 100. This is a national comparison—not a Point Cook AUD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Australia in 2021; it does not measure a Point Cook market basket or current school tenders. GeoNames 2152819 records the locality at -37.9148, 144.7509, with snapshot population 66,781. That ranks Point Cook 34 of 50 listed places, while Werribee is the nearest listed peer at about 8 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 264.1 construction index mean?
The World Bank ICP 2021 construction PLI for Australia is 264.1, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that school work in Point Cook costs 2.641 times a current world rate.
Which Point Cook inputs are known?
The reproducible locality point is -37.9148, 144.7509 (GeoNames 2152819). Its snapshot population is 66,781, ranked 34 of 50 listed places; GeoNames classifies it as a section of a populated place in administrative area 07. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Point Cook school project, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 264.1 | Retain only as dated cross-country context |
| Local AUD/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Point Cook comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Point Cook | Snapshot population | Admin area |
|---|---|---|---|
| Werribee | 8 | 50,027 | 07 |
| Tarneit | 12 | 56,370 | 07 |
| City of Port Phillip | 19 | 112,669 | 07 |
| Melbourne | 22 | 5,435,590 | 07 |
| Melbourne City Centre | 22 | 60,057 | 07 |
| Craigieburn | 39 | 65,178 | 07 |
| Pittwater | 756 | 63,482 | 02 |
| Adelaide Hills | 635 | 72,260 | 05 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (264.1 ÷ P). At P = 100 the dimensionless ratio is 2.641; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 264.1 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Point Cook adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Point Cook, Australia
- House Construction Cost Planning: Point Cook, Australia
- Retail Construction Cost Planning: Point Cook, Australia
- School Construction Cost Planning: Werribee, Australia
- All construction costs guidance for Australia
- Climate Design Data: Point Cook, Australia
- Daylight & Orientation: Point Cook, Australia
- Solar Altitude & Azimuth: Point Cook, Australia
- Solar Shading Design: Point Cook, Australia
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames AU dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2152819). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 264.1 index give a school cost per m² for Point Cook?
No. 264.1 is the World Bank ICP 2021 national construction price-level index for Australia, with the world equal to 100. It is a cross-country screening statistic, not a Point Cook AUD/m² rate, escalation index, quote or tender estimate.
How should a Point Cook school estimate replace this screening benchmark?
Collect current Point Cook comparables on a consistent gross-floor-area basis, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- School Construction Cost Planning: Ping Shan, Hong Kong SAR, China
Ping Shan school cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Pittwater, Australia
Pittwater school cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Plymouth, United Kingdom
Plymouth school cost planning: World Bank ICP 2021 construction PLI 155.3 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Pok Fu Lam, Hong Kong SAR, China
Pok Fu Lam school cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Polokwane, South Africa
Polokwane school cost planning: World Bank ICP 2021 construction PLI 71.3 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Porirua, New Zealand
Porirua school cost planning: World Bank ICP 2021 construction PLI 362.0 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.