Building Code Glossary
Registered Design Professional in Responsible Charge: Building Code Definition
How the IBC 2009 define registered design professional in responsible charge, where the wording differs, and which chapters depend on the term.
On this page
Last updated September 7, 2026 · Definitions quoted from the 2009 International Codes as transcribed in this site's building-codes collection, with the source chapter linked for each quotation. Usage counts are computed over the chapters hosted here, one copy per code. The [ICC code library](https://codes.iccsafe.org/codes) publishes the current model text and the [ICC adoption maps](https://www.iccsafe.org/advocacy/code-adoption-maps/) show which edition a jurisdiction has adopted; those sources control.
Direct answer
Registered design professional in responsible charge is a defined term in the International Building Code (IBC) 2009, in Definitions. The code's own words are: “A registered design professional engaged by the owner to review and coordinate certain aspects of the project, as determined by the building official, for compatibility with the design of the building or structure, including submittal documents prepared by others, deferred submittal documents and phased submittal documents.” No other I-Code in this corpus defines it, so the IBC 2009 definition is the one to work from. The term is used in 3 chapters of this corpus, most often in Scope and Administration (IBC 2009), Structural Tests and Special Inspections (IBC 2009), Definitions (IBC 2009). These pages transcribe the 2009 model text; verify the definition against the edition and amendments your authority having jurisdiction has adopted.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-09-07 · Updated 2026-09-07.
What does this term mean?
Registered Design Professional in Responsible Charge — IBC 2009, Definitions:
A registered design professional engaged by the owner to review and coordinate certain aspects of the project, as determined by the building official, for compatibility with the design of the building or structure, including submittal documents prepared by others, deferred submittal documents and phased submittal documents.

What must be verified before using this guidance?
Registered Design Professional in Responsible Charge is defined once in this corpus, in the Definitions chapter of the International Building Code (IBC) 2009:
A registered design professional engaged by the owner to review and coordinate certain aspects of the project, as determined by the building official, for compatibility with the design of the building or structure, including submittal documents prepared by others, deferred submittal documents and phased submittal documents.
Where registered design professional in responsible charge is used in the code
The term appears in 3 chapters of the 2009 I-Codes hosted here. The chapters that lean on it hardest are the ones to read next.
| Chapter | Code | Mentions |
|---|---|---|
| Scope and Administration | IBC 2009 | 19 |
| Structural Tests and Special Inspections | IBC 2009 | 11 |
| Definitions | IBC 2009 | 1 |
The term in use
How the code actually writes about registered design professional in responsible charge, quoted from the 2009 text hosted here:
When it is required that documents be prepared by a registered design professional, the bUilding official shall be authorized to require the owner to engage and designate on the building permit application a registered design professional who shall act as the registered design professional in responsible charge.
Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner's agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1704.
The terms registered design professional in responsible charge is built out of
The definition above leans on 5 other defined terms. Each carries its own code definition, and a local amendment to any of them changes what registered design professional in responsible charge covers:
- Registered Design Professional — IBC 2009: An individual who is registered or licensed to practice their respective design profession as defined by the statutory requirements of the professional registration laws of the state or jurisdiction in which the project is to be constructed.
- Building Official — IBC 2009: The officer or other designated authority charged with the administration and enforcement of this code, or a duly authorized representative.
- Structure — IPC 2009: That which is built or constructed or a portion thereof.
- Building — IBC 2009: Any structure used or intended for supporting or sheltering any use or occupancy.
- Owner — IBC 2009: Any person, agent, firm or corporation having a legal or equitable interest in the property.
Registered Design Professional in Responsible Charge: what to open, and in what order
Every row is a document this term depends on. The ICC code library and the ICC adoption maps cover the middle rows.
| Check | Where | Confirmed |
|---|---|---|
| Read the definition in the adopted IBC | Definitions | |
| Re-check the requirement that uses it | Scope and Administration (IBC 2009) | |
| Re-check the requirement that uses it | Structural Tests and Special Inspections (IBC 2009) | |
| Re-check the requirement that uses it | Definitions (IBC 2009) | |
| Confirm the dependent definition | Registered Design Professional | |
| Confirm the dependent definition | Building Official | |
| Confirm the dependent definition | Structure | |
| Local amendment to any of the above | Jurisdiction's amendment list |
A research aid, not a code determination. The authority having jurisdiction decides which edition and which amendments apply.
Where can you explore related guidance?
- Explore all glossary guidance
- Registered Design Professional: Building Code Definition
- Building Official: Building Code Definition
- Structure: Building Code Definition
- Building: Building Code Definition
Sources and method
Definitions quoted from the 2009 International Codes as transcribed in this site's building-codes collection, with the source chapter linked for each quotation. Usage counts are computed over the chapters hosted here, one copy per code. The ICC code library publishes the current model text and the ICC adoption maps show which edition a jurisdiction has adopted; those sources control.
Source links
Frequently asked questions
What is the code definition of registered design professional in responsible charge?
The International Building Code (IBC) 2009 defines it in Definitions as: “A registered design professional engaged by the owner to review and coordinate certain aspects of the project, as determined by the building official, for compatibility with the design of the building or structure, including submittal documents prepared by others, deferred submittal documents and phased submittal documents.” The 2009 model text is reproduced here; the definition that binds your project is the one in the edition your jurisdiction has adopted, as amended locally.
Which parts of the code depend on registered design professional in responsible charge?
In this corpus the term is used across 3 chapters, led by Scope and Administration in the IBC 2009. Those are the sections whose scope moves if the definition is amended locally, so read them together with Chapter 2 rather than on their own.
What does IRC mean in building code?
Building is a separate defined term. The IBC 2009 defines it as: “Any structure used or intended for supporting or sheltering any use or occupancy.” That is not the same as registered design professional in responsible charge, which the IBC 2009 defines as “A registered design professional engaged by the owner to review and coordinate certain aspects of the project, as determined by the building official, for compatibility with the design of the building or structure, including submittal documents prepared by others, deferred …” — read both before applying either, and confirm the wording in the edition your jurisdiction has adopted.
Related pages
- Refrigeration System, Mechanical: Building Code Definition
Refrigeration System, Mechanical — IMC 2009 definition: A combination of interconnected refrigeration-containing parts constituting one closed refrigerant circuit in which…
- Refrigeration System, Self-contained: Building Code Definition
Refrigeration System, Self-contained — IMC 2009 definition: A complete factory-assembled and tested system that is shipped in one or more sections and has …
- Refrigeration System: Building Code Definition
Refrigeration System — IFC 2009 definition: A combination of interconnected refrigerant-containing parts constituting one closed refrigerant circuit in which a refrigerant…
- Registered Design Professional: Building Code Definition
Registered Design Professional — IBC 2009 definition: An individual who is registered or licensed to practice their respective design profession as defined by …
- Regulator, Pressure: Building Code Definition
Regulator, Pressure — IRC 2009 definition: A device placed in a gas line for reducing, controlling and maintaining the pressure in that …
- Regulator: Building Code Definition
Regulator — IRC 2009 definition: A device for controlling and maintaining a uniform gas supply pressure, either pounds-to-inches water column (MP …
The AI-powered workspace for architects.