Building Code Glossary
HPM Flammable Liquid: Building Code Definition
How the IBC 2009, IFC 2009 define hpm flammable liquid, where the wording differs, and which chapters depend on the term.
On this page
Last updated September 7, 2026 · Definitions quoted from the 2009 International Codes as transcribed in this site's building-codes collection, with the source chapter linked for each quotation. Usage counts are computed over the chapters hosted here, one copy per code. The [ICC code library](https://codes.iccsafe.org/codes) publishes the current model text and the [ICC adoption maps](https://www.iccsafe.org/advocacy/code-adoption-maps/) show which edition a jurisdiction has adopted; those sources control.
Direct answer
HPM flammable liquid is a defined term in the International Building Code (IBC) 2009, in Special Detailed Requirements Based on Use and Occupancy. The code's own words are: “An HPM liquid that is defined as either a Class I flammable liquid or a Class II or Class IlIA combustible liquid.” The IFC 2009 carries the same definition word for word, so the term means the same thing in each. The term is used in 4 chapters of this corpus, most often in Semiconductor Fabrication Facilities (IFC 2009), Definitions (IBC 2009), Special Detailed Requirements Based on Use and Occupancy (IBC 2009). These pages transcribe the 2009 model text; verify the definition against the edition and amendments your authority having jurisdiction has adopted.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-09-07 · Updated 2026-09-07.
What does this term mean?
HPM Flammable Liquid — IBC 2009, Special Detailed Requirements Based on Use and Occupancy:
An HPM liquid that is defined as either a Class I flammable liquid or a Class II or Class IlIA combustible liquid.

What must be verified before using this guidance?
Two of the I-Codes in this corpus define HPM Flammable Liquid, in identical words.
| Code | Where it is defined | Definition |
|---|---|---|
| IBC 2009 | Special Detailed Requirements Based on Use and Occupancy | An HPM liquid that is defined as either a Class I flammable liquid or a Class II or Class IlIA combustible liquid. |
| IFC 2009 | Semiconductor Fabrication Facilities | An HPM liquid that is defined as either a Class I flammable liquid or a Class II or Class IlIA combustible liquid. |
Where hpm flammable liquid is used in the code
The term appears in 4 chapters of the 2009 I-Codes hosted here. The chapters that lean on it hardest are the ones to read next.
| Chapter | Code | Mentions |
|---|---|---|
| Semiconductor Fabrication Facilities | IFC 2009 | 4 |
| Definitions | IBC 2009 | 1 |
| Special Detailed Requirements Based on Use and Occupancy | IBC 2009 | 1 |
| Definitions | IFC 2009 | 1 |
The terms HPM flammable liquid is built out of
The definition above leans on 3 other defined terms. Each carries its own code definition, and a local amendment to any of them changes what HPM flammable liquid covers:
- Combustible Liquid — IBC 2009: A liquid having a closed cup flash point at or above 100°F (38°C).
- Flammable Liquid — IBC 2009: A liquid having a closed cup flash point below 100°F (38°C).
- Liquid — IBC 2009: A material that has a melting point that is equal to or less than 68°F (20°C) and a boiling point that is greater than 68°F (20°C) at 14.7 pounds per square inch absolute (psia) (101 kPa).
HPM Flammable Liquid: what to open, and in what order
Every row is a document this term depends on. The ICC code library and the ICC adoption maps cover the middle rows.
| Check | Where | Confirmed |
|---|---|---|
| Read the definition in the adopted IBC | Special Detailed Requirements Based on Use and Occupancy | |
| Read the definition in the adopted IFC | Semiconductor Fabrication Facilities | |
| Re-check the requirement that uses it | Semiconductor Fabrication Facilities (IFC 2009) | |
| Re-check the requirement that uses it | Definitions (IBC 2009) | |
| Re-check the requirement that uses it | Special Detailed Requirements Based on Use and Occupancy (IBC 2009) | |
| Re-check the requirement that uses it | Definitions (IFC 2009) | |
| Confirm the dependent definition | Combustible Liquid | |
| Confirm the dependent definition | Flammable Liquid | |
| Confirm the dependent definition | Liquid | |
| Local amendment to any of the above | Jurisdiction's amendment list |
A research aid, not a code determination. The authority having jurisdiction decides which edition and which amendments apply.
Where can you explore related guidance?
- Explore all glossary guidance
- Combustible Liquid: Building Code Definition
- Flammable Liquid: Building Code Definition
- Liquid: Building Code Definition
Sources and method
Definitions quoted from the 2009 International Codes as transcribed in this site's building-codes collection, with the source chapter linked for each quotation. Usage counts are computed over the chapters hosted here, one copy per code. The ICC code library publishes the current model text and the ICC adoption maps show which edition a jurisdiction has adopted; those sources control.
Source links
Frequently asked questions
What is the code definition of hpm flammable liquid?
The International Building Code (IBC) 2009 defines it in Special Detailed Requirements Based on Use and Occupancy as: “An HPM liquid that is defined as either a Class I flammable liquid or a Class II or Class IlIA combustible liquid.” The 2009 model text is reproduced here; the definition that binds your project is the one in the edition your jurisdiction has adopted, as amended locally.
Which parts of the code depend on hpm flammable liquid?
In this corpus the term is used across 4 chapters, led by Semiconductor Fabrication Facilities in the IFC 2009. Those are the sections whose scope moves if the definition is amended locally, so read them together with Chapter 2 rather than on their own.
Related pages
- Hot Work Permits: Building Code Definition
Hot Work Permits — IFC 2009 definition: Permits issued by the responsible person at the facility under the hot work permit program permitting …
- Hot Work Program: Building Code Definition
Hot Work Program — IFC 2009 definition: A permitted program, carried out by approved facilities-designated personnel, allowing them to oversee and issue permits …
- Hot Work: Building Code Definition
Hot Work — IFC 2009 definition: Operations including cutting, welding, Thermit welding, brazing, soldering, grinding, thermal spraying, thawing pipe, installation of torch-…
- HPM Room: Building Code Definition
HPM Room — IBC 2009 definition: A room used in conjunction with or serving a Group H-5 occupancy, where HPM is stored …
- Hurricane-prone Regions: Building Code Definition
Hurricane-prone Regions — IRC 2009 definition: Areas vulnerable to hurricanes, defined as the U.S.
- Hydrogen Cutoff Room: Building Code Definition
Hydrogen Cutoff Room — IBC 2009 definition: A room or space that is intended exclusively to house a gaseous hydrogen system.
The AI-powered workspace for architects.