Updated 2026-09-15

Construction Costs

Retail Construction Cost Planning: Mercier–Hochelaga-Maisonneuve, Canada

Mercier–Hochelaga-Maisonneuve retail cost planning using the World Bank ICP 2021 national construction price-level index of 217.0, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/CAN/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames CA dump](https://download.geonames.org/export/dump/CA.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 13546319). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early retail construction cost planning in Mercier–Hochelaga-Maisonneuve, the World Bank ICP reports a 2021 Canada construction price-level index of 217.0, with the world equal to 100. This is a national comparison—not a Mercier–Hochelaga-Maisonneuve CAD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Canada in 2021; it does not measure a Mercier–Hochelaga-Maisonneuve market basket or current retail tenders. GeoNames 13546319 records the locality at 45.5719, -73.5463, with snapshot population 142,753. That ranks Mercier–Hochelaga-Maisonneuve 45 of 50 listed places, while Villeray–Saint-Michel–Parc-Extension is the nearest listed peer at about 5 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 217.0 construction index mean?

The World Bank ICP 2021 construction PLI for Canada is 217.0, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that retail work in Mercier–Hochelaga-Maisonneuve costs 2.170 times a current world rate.

Which Mercier–Hochelaga-Maisonneuve inputs are known?

The reproducible locality point is 45.5719, -73.5463 (GeoNames 13546319). Its snapshot population is 142,753, ranked 45 of 50 listed places; GeoNames classifies it as a fourth-order administrative seat in administrative area 10. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a Mercier–Hochelaga-Maisonneuve retail project, reconcile shell condition, tenant fit-out, servicing, trading constraints and landlord works. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 217.0Retain only as dated cross-country context
Local CAD/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

Mercier–Hochelaga-Maisonneuve comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from Mercier–Hochelaga-MaisonneuveSnapshot populationAdmin area
Villeray–Saint-Michel–Parc-Extension5144,81410
Le Vieux-Longueuil5135,21810
Rosemont–La Petite-Patrie6146,50110
Montréal81,762,94910
Longueuil9229,33010
Lévis228143,41410
Guelph577143,74008
Abbotsford3,629141,39702

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (217.0 ÷ P). At P = 100 the dimensionless ratio is 2.170; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI217.0 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local Mercier–Hochelaga-Maisonneuve adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames CA dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 13546319). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 217.0 index give a retail cost per m² for Mercier–Hochelaga-Maisonneuve?

No. 217.0 is the World Bank ICP 2021 national construction price-level index for Canada, with the world equal to 100. It is a cross-country screening statistic, not a Mercier–Hochelaga-Maisonneuve CAD/m² rate, escalation index, quote or tender estimate.

How should a Mercier–Hochelaga-Maisonneuve retail estimate replace this screening benchmark?

Collect current Mercier–Hochelaga-Maisonneuve comparables on a consistent gross-floor-area basis, reconcile shell condition, tenant fit-out, servicing, trading constraints and landlord works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.

The AI-powered workspacefor architects.