Construction Costs
School Construction Cost Planning: Windsor, Canada
Windsor school cost planning using the World Bank ICP 2021 national construction price-level index of 217.0, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/CAN/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames CA dump](https://download.geonames.org/export/dump/CA.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 6182962). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early school construction cost planning in Windsor, the World Bank ICP reports a 2021 Canada construction price-level index of 217.0, with the world equal to 100. This is a national comparison—not a Windsor CAD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Canada in 2021; it does not measure a Windsor market basket or current school tenders. GeoNames 6182962 records the locality at 42.3001, -83.0165, with snapshot population 229,660. That ranks Windsor 24 of 50 listed places, while London is the nearest listed peer at about 164 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 217.0 construction index mean?
The World Bank ICP 2021 construction PLI for Canada is 217.0, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that school work in Windsor costs 2.170 times a current world rate.
Which Windsor inputs are known?
The reproducible locality point is 42.3001, -83.0165 (GeoNames 6182962). Its snapshot population is 229,660, ranked 24 of 50 listed places; GeoNames classifies it as a populated place in administrative area 08. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Windsor school project, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 217.0 | Retain only as dated cross-country context |
| Local CAD/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Windsor comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Windsor | Snapshot population | Admin area |
|---|---|---|---|
| London | 164 | 422,324 | 08 |
| Kitchener | 239 | 256,885 | 08 |
| Guelph | 264 | 143,740 | 08 |
| Hamilton | 279 | 569,353 | 08 |
| Burlington | 286 | 186,948 | 08 |
| Longueuil | 844 | 229,330 | 10 |
| Regina | 1,879 | 226,404 | 11 |
| Oakville | 300 | 213,759 | 08 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (217.0 ÷ P). At P = 100 the dimensionless ratio is 2.170; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 217.0 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Windsor adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Windsor, Canada
- House Construction Cost Planning: Windsor, Canada
- Retail Construction Cost Planning: Windsor, Canada
- School Construction Cost Planning: London, Canada
- All construction costs guidance for Canada
- Climate Design Data: Windsor, Canada
- Daylight & Orientation: Windsor, Canada
- Solar Altitude & Azimuth: Windsor, Canada
- Solar Shading Design: Windsor, Canada
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames CA dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 6182962). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 217.0 index give a school cost per m² for Windsor?
No. 217.0 is the World Bank ICP 2021 national construction price-level index for Canada, with the world equal to 100. It is a cross-country screening statistic, not a Windsor CAD/m² rate, escalation index, quote or tender estimate.
How should a Windsor school estimate replace this screening benchmark?
Collect current Windsor comparables on a consistent gross-floor-area basis, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- School Construction Cost Planning: Whampoa, Hong Kong SAR, China
Whampoa school cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Whanganui, New Zealand
Whanganui school cost planning: World Bank ICP 2021 construction PLI 362.0 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Whangarei, New Zealand
Whangarei school cost planning: World Bank ICP 2021 construction PLI 362.0 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Winnipeg, Canada
Winnipeg school cost planning: World Bank ICP 2021 construction PLI 217.0 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Wollongong, Australia
Wollongong school cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Wolverhampton, United Kingdom
Wolverhampton school cost planning: World Bank ICP 2021 construction PLI 155.3 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.