Construction Costs
School Construction Cost Planning: Saguenay, Canada
Saguenay school cost planning using the World Bank ICP 2021 national construction price-level index of 217.0, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/CAN/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames CA dump](https://download.geonames.org/export/dump/CA.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 6137270). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early school construction cost planning in Saguenay, the World Bank ICP reports a 2021 Canada construction price-level index of 217.0, with the world equal to 100. This is a national comparison—not a Saguenay CAD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Canada in 2021; it does not measure a Saguenay market basket or current school tenders. GeoNames 6137270 records the locality at 48.4168, -71.0657, with snapshot population 148,886. That ranks Saguenay 36 of 50 listed places, while Québec is the nearest listed peer at about 179 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 217.0 construction index mean?
The World Bank ICP 2021 construction PLI for Canada is 217.0, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that school work in Saguenay costs 2.170 times a current world rate.
Which Saguenay inputs are known?
The reproducible locality point is 48.4168, -71.0657 (GeoNames 6137270). Its snapshot population is 148,886, ranked 36 of 50 listed places; GeoNames classifies it as a populated place in administrative area 10. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Saguenay school project, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 217.0 | Retain only as dated cross-country context |
| Local CAD/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Saguenay comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Saguenay | Snapshot population | Admin area |
|---|---|---|---|
| Québec | 179 | 531,902 | 10 |
| Lévis | 180 | 143,414 | 10 |
| Trois-Rivières | 256 | 144,472 | 10 |
| Mercier–Hochelaga-Maisonneuve | 368 | 142,753 | 10 |
| Le Vieux-Longueuil | 370 | 135,218 | 10 |
| Coquitlam | 3,710 | 148,625 | 02 |
| Barrie | 796 | 147,829 | 08 |
| Gloucester | 486 | 150,012 | 08 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (217.0 ÷ P). At P = 100 the dimensionless ratio is 2.170; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 217.0 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Saguenay adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Saguenay, Canada
- House Construction Cost Planning: Saguenay, Canada
- Retail Construction Cost Planning: Saguenay, Canada
- School Construction Cost Planning: Québec, Canada
- All construction costs guidance for Canada
- Climate Design Data: Saguenay, Canada
- Daylight & Orientation: Saguenay, Canada
- Solar Altitude & Azimuth: Saguenay, Canada
- Solar Shading Design: Saguenay, Canada
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames CA dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 6137270). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 217.0 index give a school cost per m² for Saguenay?
No. 217.0 is the World Bank ICP 2021 national construction price-level index for Canada, with the world equal to 100. It is a cross-country screening statistic, not a Saguenay CAD/m² rate, escalation index, quote or tender estimate.
How should a Saguenay school estimate replace this screening benchmark?
Collect current Saguenay comparables on a consistent gross-floor-area basis, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- School Construction Cost Planning: Rotorua, New Zealand
Rotorua school cost planning: World Bank ICP 2021 construction PLI 362.0 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Ruiru, Kenya
Ruiru school cost planning: World Bank ICP 2021 construction PLI 64.9 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Rustenburg, South Africa
Rustenburg school cost planning: World Bank ICP 2021 construction PLI 71.3 (World=100), scope limits and 7 GeoNames comparison locations.
- School Construction Cost Planning: San Jose del Monte, Philippines
San Jose del Monte school cost planning: World Bank ICP 2021 construction PLI 49.3 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: San Pablo, Philippines
San Pablo school cost planning: World Bank ICP 2021 construction PLI 49.3 (World=100), scope limits and 7 GeoNames comparison locations.
- School Construction Cost Planning: San Pedro, Philippines
San Pedro school cost planning: World Bank ICP 2021 construction PLI 49.3 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.