Construction Costs
Office Construction Cost Planning: Trois-Rivières, Canada
Trois-Rivières office cost planning using the World Bank ICP 2021 national construction price-level index of 217.0, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/CAN/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames CA dump](https://download.geonames.org/export/dump/CA.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 6169141). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early office construction cost planning in Trois-Rivières, the World Bank ICP reports a 2021 Canada construction price-level index of 217.0, with the world equal to 100. This is a national comparison—not a Trois-Rivières CAD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Canada in 2021; it does not measure a Trois-Rivières market basket or current office tenders. GeoNames 6169141 records the locality at 46.3451, -72.5477, with snapshot population 144,472. That ranks Trois-Rivières 42 of 50 listed places, while Québec is the nearest listed peer at about 114 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 217.0 construction index mean?
The World Bank ICP 2021 construction PLI for Canada is 217.0, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that office work in Trois-Rivières costs 2.170 times a current world rate.
Which Trois-Rivières inputs are known?
The reproducible locality point is 46.3451, -72.5477 (GeoNames 6169141). Its snapshot population is 144,472, ranked 42 of 50 listed places; GeoNames classifies it as a populated place in administrative area 10. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Trois-Rivières office project, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 217.0 | Retain only as dated cross-country context |
| Local CAD/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Trois-Rivières comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Trois-Rivières | Snapshot population | Admin area |
|---|---|---|---|
| Québec | 114 | 531,902 | 10 |
| Mercier–Hochelaga-Maisonneuve | 116 | 142,753 | 10 |
| Lévis | 116 | 143,414 | 10 |
| Le Vieux-Longueuil | 117 | 135,218 | 10 |
| Longueuil | 117 | 229,330 | 10 |
| Kelowna | 3,449 | 144,576 | 02 |
| Villeray–Saint-Michel–Parc-Extension | 120 | 144,814 | 10 |
| Guelph | 681 | 143,740 | 08 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (217.0 ÷ P). At P = 100 the dimensionless ratio is 2.170; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 217.0 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Trois-Rivières adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- House Construction Cost Planning: Trois-Rivières, Canada
- School Construction Cost Planning: Trois-Rivières, Canada
- Retail Construction Cost Planning: Trois-Rivières, Canada
- Office Construction Cost Planning: Longueuil, Canada
- All construction costs guidance for Canada
- Climate Design Data: Trois-Rivières, Canada
- Daylight & Orientation: Trois-Rivières, Canada
- Solar Altitude & Azimuth: Trois-Rivières, Canada
- Solar Shading Design: Trois-Rivières, Canada
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames CA dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 6169141). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 217.0 index give a office cost per m² for Trois-Rivières?
No. 217.0 is the World Bank ICP 2021 national construction price-level index for Canada, with the world equal to 100. It is a cross-country screening statistic, not a Trois-Rivières CAD/m² rate, escalation index, quote or tender estimate.
How should a Trois-Rivières office estimate replace this screening benchmark?
Collect current Trois-Rivières comparables on a consistent gross-floor-area basis, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- Office Construction Cost Planning: Toronto, Canada
Toronto office cost planning: World Bank ICP 2021 construction PLI 217.0 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Townsville, Australia
Townsville office cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Tralee, Ireland
Tralee office cost planning: World Bank ICP 2021 construction PLI 152.8 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Tseung Kwan O, Hong Kong SAR, China
Tseung Kwan O office cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Tsing Yi Town, Hong Kong SAR, China
Tsing Yi Town office cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
- Office Construction Cost Planning: Tsuen Wan, Hong Kong SAR, China
Tsuen Wan office cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.