Updated 2026-10-01

US Building Code Adoption by State

Massachusetts Building Code: Which Editions Are Adopted

Which I-Code editions Massachusetts is recorded as adopting, what the record does not cover, and how to confirm the edition governing a project.

On this page

Last updated October 1, 2026 · Adopted editions transcribed from the [ICC Master I-Code Adoption Chart (January 2024)](https://www.iccsafe.org/wp-content/uploads/Master-I-Code-Adoption-Chart-1.pdf), reproduced with the chart's own legend so an “X” is not mistaken for a statewide adoption. ICC notes that not all jurisdictions report their adoptions and publishes updates at [iccsafe.org/adoptions](https://www.iccsafe.org/adoptions). The current edition, its effective date and the state amendments are published by [Massachusetts Board of Building Regulations and Standards and Department of Energy Resources](https://www.mass.gov/info-details/2025-massachusetts-building-energy-codes), which controls.

Direct answer

Massachusetts State Building Code (780 CMR), Tenth Edition, effective 11 October 2024 in Massachusetts. 2021 IBC, IRC, IEBC and IECC with Massachusetts amendments, issued by the Board of Building Regulations and Standards as 780 CMR. Permit applications filed up to 30 June 2025 could use either the Ninth or the Tenth Edition, but not a mix of both; from 1 July 2025 only the Tenth Edition applies. Record the permit application date with it: a code change normally applies from an effective date, and an application filed before that date is usually reviewed under the previous edition. This was checked on 2026-10-01 against Massachusetts Board of Building Regulations and Standards and Department of Energy Resources, which is the source that controls. The cross-state comparison further down this page comes from the ICC adoption chart dated January 2024, so where the two disagree the record above is the newer one.

Content and cited inputs reviewed by Harth team · Published 2026-09-07 · Updated 2026-10-01.

Code-adoption status diagram: Massachusetts Building Code: Which Editions Are Adopted
Which I-Code editions Massachusetts is recorded as adopting, what the record does not cover, and how to confirm the edition governing a project.

Which codes has Massachusetts adopted now?

Massachusetts State Building Code (780 CMR), Tenth Edition, effective 11 October 2024.

2021 IBC, IRC, IEBC and IECC with Massachusetts amendments, issued by the Board of Building Regulations and Standards as 780 CMR.

DisciplineAdopted
Building780 CMR Tenth Edition, based on the 2021 IBC
Residential780 CMR 51.00 Massachusetts Residential Code, based on the 2021 IRC
Energy (base)2021 IECC with Massachusetts amendments (780 CMR Chapters 11R and 13)
Energy (opt-in)Stretch Code and Specialized Code, 2021 IECC with amendments (225 CMR 22.00 and 23.00)
Existing buildings780 CMR Tenth Edition, based on the 2021 IEBC
Fire527 CMR 1.00, based on NFPA 1 (2021)

Transition: Permit applications filed up to 30 June 2025 could use either the Ninth or the Tenth Edition, but not a mix of both; from 1 July 2025 only the Tenth Edition applies.

Local adoption: The building code applies uniformly statewide. For energy, municipalities choose between the base energy code in 780 CMR and the opt-in Stretch Code or Specialized Code (225 CMR 22.00 and 23.00), both also built on the 2021 IECC and maintained by the Department of Energy Resources. Fire safety follows 527 CMR 1.00, which is based on NFPA 1 (2021).

Checked 2026-10-01 against Massachusetts Board of Building Regulations and Standards and Department of Energy Resources. Confirm the edition and effective date for the specific permit jurisdiction before relying on it.

The cross-state record

For comparison across states, every I-Code the ICC Master I-Code Adoption Chart (January 2024) tracks, as it records Massachusetts. Where this disagrees with the record above, the record above is newer:

CodeRecorded adoption
International Building Code (IBC)2015
International Residential Code (IRC)2015
International Fire Code (IFC)Some jurisdictions only
International Mechanical Code (IMC)2015
International Plumbing Code (IPC)Not adopted
International Private Sewage Disposal Code (IPSDC)Not adopted
International Fuel Gas Code (IFGC)Not adopted
International Green Construction Code (IgCC)Not adopted
International Energy Conservation Code — Residential (IECC-R)2021, as a stretch code only
International Energy Conservation Code — Commercial (IECC-C)2021, as a stretch code only
International Property Maintenance Code (IPMC)Not adopted
International Existing Building Code (IEBC)2015
International Swimming Pool and Spa Code (ISPSC)2015
ICC Performance Code (ICCPC)Not adopted
International Wildland-Urban Interface Code (IWUIC)Not adopted
International Zoning Code (IZC)Not adopted
ICC 700 National Green Building Standard (ICC 700)Not adopted

Massachusetts has a recorded edition year for 5 of the 17 codes: 2015 for the building, residential, mechanical, existing buildings and swimming pool and spa codes. The fire code appears as adopted by individual state or local agencies rather than as a statewide standard, so whether it applies depends on the permit jurisdiction for the project address. The residential energy and commercial energy codes are recorded as a stretch code, which a jurisdiction may adopt above the base code rather than instead of it. No adoption at all is recorded for the plumbing, private sewage, fuel gas, green construction, property maintenance, performance, wildland-urban interface, zoning and green building standard codes.

Source: ICC Master I-Code Adoption Chart (January 2024).

How Massachusetts compares with its neighbours

StateBuilding (IBC)Residential (IRC)Residential energy (IECC-R)
Massachusetts2021*2021*2021*
Connecticut2021*2021*2021*
Rhode Island202120212024
New Hampshire202420242018
New York2024*2024*2024*

Statewide editions in force, checked 2026-10-01; “Local” means no state adoption, “(limited)” a state adoption for some buildings only, and * a state-titled code built on that edition.

Rhode Island, New Hampshire and New York differ from Massachusetts on the building code alone. A practice working across that border is working to two editions, whatever the office standard says.

Where Massachusetts sits in the national record

Of the 50 states and the District of Columbia, 17 enforce the 2021 IBC statewide, 10 a later edition, 7 an earlier one, and 17 have no statewide IBC edition in force. Massachusetts is at or ahead of the national middle on the building code, so the risk runs the other way: work arriving from a slower-moving state may be drawn to an older edition.

Across all 17 codes the January 2024 ICC chart tracks, Massachusetts has a recorded edition for 5, which ranked it 36th of 51. A low count is not a gap in regulation — it usually means the state legislates through its own documents, or leaves the discipline to local adoption.

What the chart does and does not tell you

The chart's own legend matters more than the numbers:

  • An edition year means one or more state or local agencies adopted that edition. It does not mean every building in the state is designed to it.
  • “Some jurisdictions only” is the chart's X: the code is in use somewhere in the state but is not the standard for all buildings.
  • “Not adopted” is a blank cell — no state or local jurisdiction reported adopting that code.
  • “State-written code” means the state publishes its own document in place of the model edition, so the model text is a reference, not the law.

ICC states plainly that not every jurisdiction notifies it of an adoption, and this chart is dated January 2024. Treat it as the starting point for a search, never as the answer.

How to confirm the edition that governs a Massachusetts project

  1. Open Massachusetts Board of Building Regulations and Standards and Department of Energy Resources and find the currently adopted code list with its effective date.
  2. Check whether the permit authority for the project address is the state or a local programme with its own adoption.
  3. Read the state amendments alongside the model edition — an amended table or definition changes the requirement even when the edition matches.
  4. Record the permit application date. A code change usually applies from an effective date, and applications filed before it are normally reviewed under the previous edition.
  5. Get the answer in writing from the authority having jurisdiction before it drives a design decision.

This site also hosts a transcription of the 2009 model code chapters as adopted in Massachusetts at /building-codes/us-states/massachusetts. That is a historical reference for the 2009 editions and is not Massachusetts's current code basis.

Massachusetts code-basis worksheet

Fill this in once per project and keep it with the drawing set. Every row is a question a plan reviewer can ask, and the answer changes with the address and the application date, not with the state.

ItemProject entry
Project address and permit jurisdiction
State programme or local programme as AHJ
Building / residential edition and effective date
Energy code edition (or state-written code)
Fire, mechanical, plumbing and fuel-gas editions
Accessibility standard and edition
State amendments consulted (citation)
Local amendments consulted (citation)
Permit application date and vesting rule
Written AHJ confirmation (date, name)

This worksheet records a determination; it does not make one. The authority having jurisdiction decides which edition and which amendments apply.

Sources and method

Adopted editions transcribed from the ICC Master I-Code Adoption Chart (January 2024), reproduced with the chart's own legend so an “X” is not mistaken for a statewide adoption. ICC notes that not all jurisdictions report their adoptions and publishes updates at iccsafe.org/adoptions. The current edition, its effective date and the state amendments are published by Massachusetts Board of Building Regulations and Standards and Department of Energy Resources, which controls.

Frequently asked questions

Which building code edition does Massachusetts use?

Massachusetts State Building Code (780 CMR), Tenth Edition, effective 11 October 2024. 2021 IBC, IRC, IEBC and IECC with Massachusetts amendments, issued by the Board of Building Regulations and Standards as 780 CMR. This was checked on 2026-10-01 against Massachusetts Board of Building Regulations and Standards and Department of Energy Resources; confirm the edition and effective date for the permit jurisdiction before relying on it.

How current is this record?

The adoption above was checked on 2026-10-01 against Massachusetts Board of Building Regulations and Standards and Department of Energy Resources, the source that controls. The cross-state table comes from the ICC Master I-Code Adoption Chart (January 2024), which is older, so where the two disagree the checked record is the one to use.