Updated 2026-09-15

Construction Costs

Retail Construction Cost Planning: San Jose del Monte, Philippines

San Jose del Monte retail cost planning using the World Bank ICP 2021 national construction price-level index of 49.3, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/PHL/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames PH dump](https://download.geonames.org/export/dump/PH.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1689395). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early retail construction cost planning in San Jose del Monte, the World Bank ICP reports a 2021 Philippines construction price-level index of 49.3, with the world equal to 100. This is a national comparison—not a San Jose del Monte PHP/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Philippines in 2021; it does not measure a San Jose del Monte market basket or current retail tenders. GeoNames 1689395 records the locality at 14.8139, 121.0453, with snapshot population 357,828. That ranks San Jose del Monte 34 of 50 listed places, while Bagong Silang is the nearest listed peer at about 4 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 49.3 construction index mean?

The World Bank ICP 2021 construction PLI for Philippines is 49.3, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that retail work in San Jose del Monte costs 0.493 times a current world rate.

Which San Jose del Monte inputs are known?

The reproducible locality point is 14.8139, 121.0453 (GeoNames 1689395). Its snapshot population is 357,828, ranked 34 of 50 listed places; GeoNames classifies it as a third-order administrative seat in administrative area 03. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a San Jose del Monte retail project, reconcile shell condition, tenant fit-out, servicing, trading constraints and landlord works. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 49.3Retain only as dated cross-country context
Local PHP/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

San Jose del Monte comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from San Jose del MonteSnapshot populationAdmin area
Bagong Silang4261,729NCR
Valenzuela15725,173NCR
Quezon City183,084,270NCR
Malabon19365,525NCR
Marikina City20471,323NCR
Bacoor41356,97440
San Pedro51348,96840
Cabanatuan City75343,67203

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (49.3 ÷ P). At P = 100 the dimensionless ratio is 0.493; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI49.3 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local San Jose del Monte adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames PH dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1689395). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 49.3 index give a retail cost per m² for San Jose del Monte?

No. 49.3 is the World Bank ICP 2021 national construction price-level index for Philippines, with the world equal to 100. It is a cross-country screening statistic, not a San Jose del Monte PHP/m² rate, escalation index, quote or tender estimate.

How should a San Jose del Monte retail estimate replace this screening benchmark?

Collect current San Jose del Monte comparables on a consistent gross-floor-area basis, reconcile shell condition, tenant fit-out, servicing, trading constraints and landlord works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.