House Construction Cost Planning: Cotabato, Philippines

Cotabato house cost planning using the World Bank ICP 2021 national construction price-level index of 49.3, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/PHL/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames PH dump](https://download.geonames.org/export/dump/PH.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1716771). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early house construction cost planning in Cotabato, the World Bank ICP reports a 2021 Philippines construction price-level index of 49.3, with the world equal to 100. This is a national comparison—not a Cotabato PHP/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Philippines in 2021; it does not measure a Cotabato market basket or current house tenders. GeoNames 1716771 records the locality at 7.2236, 124.2464, with snapshot population 383,383. That ranks Cotabato 32 of 50 listed places, while Budta is the nearest listed peer at about 21 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 49.3 construction index mean?

The World Bank ICP 2021 construction PLI for Philippines is 49.3, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that house work in Cotabato costs 0.493 times a current world rate.

Which Cotabato inputs are known?

The reproducible locality point is 7.2236, 124.2464 (GeoNames 1716771). Its snapshot population is 383,383, ranked 32 of 50 listed places; GeoNames classifies it as a first-order administrative seat in administrative area 14. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a Cotabato house project, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 49.3Retain only as dated cross-country context
Local PHP/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

Cotabato comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from CotabatoSnapshot populationAdmin area
Budta211,273,71514
Malingao261,121,97412
Mantampay105265,03210
Iligan112342,61810
Iligan City115312,32312
Tarlac City1,000401,89203
Malabon903365,525NCR
San Jose del Monte913357,82803

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (49.3 ÷ P). At P = 100 the dimensionless ratio is 0.493; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI49.3 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local Cotabato adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames PH dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1716771). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 49.3 index give a house cost per m² for Cotabato?

No. 49.3 is the World Bank ICP 2021 national construction price-level index for Philippines, with the world equal to 100. It is a cross-country screening statistic, not a Cotabato PHP/m² rate, escalation index, quote or tender estimate.

How should a Cotabato house estimate replace this screening benchmark?

Collect current Cotabato comparables on a consistent gross-floor-area basis, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.