Construction Costs
House Construction Cost Planning: Bacolod City, Philippines
Bacolod City house cost planning using the World Bank ICP 2021 national construction price-level index of 49.3, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/PHL/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames PH dump](https://download.geonames.org/export/dump/PH.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1729564). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early house construction cost planning in Bacolod City, the World Bank ICP reports a 2021 Philippines construction price-level index of 49.3, with the world equal to 100. This is a national comparison—not a Bacolod City PHP/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Philippines in 2021; it does not measure a Bacolod City market basket or current house tenders. GeoNames 1729564 records the locality at 10.6667, 122.9500, with snapshot population 454,898. That ranks Bacolod City 26 of 50 listed places, while Mansilingan is the nearest listed peer at about 5 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 49.3 construction index mean?
The World Bank ICP 2021 construction PLI for Philippines is 49.3, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that house work in Bacolod City costs 0.493 times a current world rate.
Which Bacolod City inputs are known?
The reproducible locality point is 10.6667, 122.9500 (GeoNames 1729564). Its snapshot population is 454,898, ranked 26 of 50 listed places; GeoNames classifies it as a second-order administrative seat in administrative area 06. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Bacolod City house project, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 49.3 | Retain only as dated cross-country context |
| Local PHP/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Bacolod City comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Bacolod City | Snapshot population | Admin area |
|---|---|---|---|
| Mansilingan | 5 | 454,150 | 06 |
| Iloilo | 42 | 473,728 | 06 |
| Cebu City | 110 | 965,332 | 07 |
| Mandaue City | 113 | 331,320 | 07 |
| Lapu-Lapu City | 116 | 497,813 | 07 |
| Mandaluyong City | 482 | 465,902 | NCR |
| Dasmariñas | 462 | 441,876 | 40 |
| Marikina City | 485 | 471,323 | NCR |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (49.3 ÷ P). At P = 100 the dimensionless ratio is 0.493; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 49.3 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Bacolod City adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Bacolod City, Philippines
- School Construction Cost Planning: Bacolod City, Philippines
- Retail Construction Cost Planning: Bacolod City, Philippines
- House Construction Cost Planning: Mansilingan, Philippines
- All construction costs guidance for Philippines
- Climate Design Data: Bacolod City, Philippines
- Sun Path: Bacolod City, Philippines
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames PH dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1729564). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 49.3 index give a house cost per m² for Bacolod City?
No. 49.3 is the World Bank ICP 2021 national construction price-level index for Philippines, with the world equal to 100. It is a cross-country screening statistic, not a Bacolod City PHP/m² rate, escalation index, quote or tender estimate.
How should a Bacolod City house estimate replace this screening benchmark?
Collect current Bacolod City comparables on a consistent gross-floor-area basis, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- House Construction Cost Planning: Auckland, New Zealand
Auckland house cost planning: World Bank ICP 2021 construction PLI 362.0 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Aurangabad, India
Aurangabad house cost planning: World Bank ICP 2021 construction PLI 37.7 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Avondale, New Zealand
Avondale house cost planning: World Bank ICP 2021 construction PLI 362.0 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Bacoor, Philippines
Bacoor house cost planning: World Bank ICP 2021 construction PLI 49.3 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Balbriggan, Ireland
Balbriggan house cost planning: World Bank ICP 2021 construction PLI 152.8 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Ballarat, Australia
Ballarat house cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.