Construction Costs
House Construction Cost Planning: Cagayan de Oro, Philippines
Cagayan de Oro house cost planning using the World Bank ICP 2021 national construction price-level index of 49.3, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/PHL/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames PH dump](https://download.geonames.org/export/dump/PH.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1721080). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early house construction cost planning in Cagayan de Oro, the World Bank ICP reports a 2021 Philippines construction price-level index of 49.3, with the world equal to 100. This is a national comparison—not a Cagayan de Oro PHP/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Philippines in 2021; it does not measure a Cagayan de Oro market basket or current house tenders. GeoNames 1721080 records the locality at 8.4822, 124.6472, with snapshot population 741,617. That ranks Cagayan de Oro 12 of 50 listed places, while Iligan City is the nearest listed peer at about 38 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 49.3 construction index mean?
The World Bank ICP 2021 construction PLI for Philippines is 49.3, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that house work in Cagayan de Oro costs 0.493 times a current world rate.
Which Cagayan de Oro inputs are known?
The reproducible locality point is 8.4822, 124.6472 (GeoNames 1721080). Its snapshot population is 741,617, ranked 12 of 50 listed places; GeoNames classifies it as a second-order administrative seat in administrative area 10. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Cagayan de Oro house project, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 49.3 | Retain only as dated cross-country context |
| Local PHP/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Cagayan de Oro comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Cagayan de Oro | Snapshot population | Admin area |
|---|---|---|---|
| Iligan City | 38 | 312,323 | 12 |
| Iligan | 53 | 342,618 | 10 |
| Mantampay | 59 | 265,032 | 10 |
| Butuan | 111 | 309,709 | 13 |
| Budta | 144 | 1,273,715 | 14 |
| Valenzuela | 799 | 725,173 | NCR |
| General Santos | 270 | 722,059 | 12 |
| Paranaque City | 775 | 703,245 | NCR |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (49.3 ÷ P). At P = 100 the dimensionless ratio is 0.493; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 49.3 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Cagayan de Oro adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Cagayan de Oro, Philippines
- School Construction Cost Planning: Cagayan de Oro, Philippines
- Retail Construction Cost Planning: Cagayan de Oro, Philippines
- House Construction Cost Planning: Iligan City, Philippines
- All construction costs guidance for Philippines
- Climate Design Data: Cagayan de Oro, Philippines
- Sun Path: Cagayan de Oro, Philippines
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames PH dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 1721080). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 49.3 index give a house cost per m² for Cagayan de Oro?
No. 49.3 is the World Bank ICP 2021 national construction price-level index for Philippines, with the world equal to 100. It is a cross-country screening statistic, not a Cagayan de Oro PHP/m² rate, escalation index, quote or tender estimate.
How should a Cagayan de Oro house estimate replace this screening benchmark?
Collect current Cagayan de Oro comparables on a consistent gross-floor-area basis, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- House Construction Cost Planning: Butuan, Philippines
Butuan house cost planning: World Bank ICP 2021 construction PLI 49.3 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Cabanatuan City, Philippines
Cabanatuan City house cost planning: World Bank ICP 2021 construction PLI 49.3 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Cabuyao, Philippines
Cabuyao house cost planning: World Bank ICP 2021 construction PLI 49.3 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Cairns, Australia
Cairns house cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Calabar, Nigeria
Calabar house cost planning: World Bank ICP 2021 construction PLI 72.8 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Calamba, Philippines
Calamba house cost planning: World Bank ICP 2021 construction PLI 49.3 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.