Updated 2026-09-15

Construction Costs

House Construction Cost Planning: Port Macquarie, Australia

Port Macquarie house cost planning using the World Bank ICP 2021 national construction price-level index of 264.1, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/AUS/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames AU dump](https://download.geonames.org/export/dump/AU.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2152659). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early house construction cost planning in Port Macquarie, the World Bank ICP reports a 2021 Australia construction price-level index of 264.1, with the world equal to 100. This is a national comparison—not a Port Macquarie AUD/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Australia in 2021; it does not measure a Port Macquarie market basket or current house tenders. GeoNames 2152659 records the locality at -31.4308, 152.9089, with snapshot population 51,965. That ranks Port Macquarie 41 of 50 listed places, while Coffs Harbour is the nearest listed peer at about 128 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 264.1 construction index mean?

The World Bank ICP 2021 construction PLI for Australia is 264.1, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that house work in Port Macquarie costs 2.641 times a current world rate.

Which Port Macquarie inputs are known?

The reproducible locality point is -31.4308, 152.9089 (GeoNames 2152659). Its snapshot population is 51,965, ranked 41 of 50 listed places; GeoNames classifies it as a populated place in administrative area 02. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a Port Macquarie house project, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 264.1Retain only as dated cross-country context
Local AUD/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

Port Macquarie comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from Port MacquarieSnapshot populationAdmin area
Coffs Harbour12878,75902
Tamworth19243,87402
Maitland19389,59702
Newcastle198508,43702
Central Coast265346,59602
Hervey Bay68352,23004
Reservoir1,00651,09607
Berwick1,00750,29807

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (264.1 ÷ P). At P = 100 the dimensionless ratio is 2.641; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI264.1 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local Port Macquarie adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames AU dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2152659). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 264.1 index give a house cost per m² for Port Macquarie?

No. 264.1 is the World Bank ICP 2021 national construction price-level index for Australia, with the world equal to 100. It is a cross-country screening statistic, not a Port Macquarie AUD/m² rate, escalation index, quote or tender estimate.

How should a Port Macquarie house estimate replace this screening benchmark?

Collect current Port Macquarie comparables on a consistent gross-floor-area basis, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.

The AI-powered workspacefor architects.