Construction Costs
School Construction Cost Planning: Fujairah, United Arab Emirates
Fujairah school cost planning using the World Bank ICP 2021 national construction price-level index of 67.1, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/ARE/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames AE dump](https://download.geonames.org/export/dump/AE.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 292878). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early school construction cost planning in Fujairah, the World Bank ICP reports a 2021 United Arab Emirates construction price-level index of 67.1, with the world equal to 100. This is a national comparison—not a Fujairah AED/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across United Arab Emirates in 2021; it does not measure a Fujairah market basket or current school tenders. GeoNames 292878 records the locality at 25.1164, 56.3414, with snapshot population 118,933. That ranks Fujairah 14 of 50 listed places, while Ţarīf Kalbā is the nearest listed peer at about 5 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 67.1 construction index mean?
The World Bank ICP 2021 construction PLI for United Arab Emirates is 67.1, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that school work in Fujairah costs 0.671 times a current world rate.
Which Fujairah inputs are known?
The reproducible locality point is 25.1164, 56.3414 (GeoNames 292878). Its snapshot population is 118,933, ranked 14 of 50 listed places; GeoNames classifies it as a first-order administrative seat in administrative area 04. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Fujairah school project, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 67.1 | Retain only as dated cross-country context |
| Local AED/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Fujairah comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Fujairah | Snapshot population | Admin area |
|---|---|---|---|
| Ţarīf Kalbā | 5 | 51,000 | 04 |
| Kalbā | 7 | 37,545 | 06 |
| Reef Al Fujairah City | 10 | 82,310 | 04 |
| Khawr Fakkān | 24 | 40,677 | 06 |
| Dibba Al-Fujairah | 54 | 30,000 | 04 |
| International City | 94 | 120,000 | 03 |
| Dubai Marina | 120 | 120,000 | 03 |
| Al Majaz | 99 | 116,503 | 06 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (67.1 ÷ P). At P = 100 the dimensionless ratio is 0.671; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 67.1 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Fujairah adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Fujairah, United Arab Emirates
- House Construction Cost Planning: Fujairah, United Arab Emirates
- Retail Construction Cost Planning: Fujairah, United Arab Emirates
- School Construction Cost Planning: Ţarīf Kalbā, United Arab Emirates
- All construction costs guidance for United Arab Emirates
- Climate Design Data: Fujairah, UAE
- Daylight & Orientation: Fujairah, UAE
- Solar Altitude & Azimuth: Fujairah, UAE
- Solar Shading Design: Fujairah, UAE
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames AE dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 292878). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 67.1 index give a school cost per m² for Fujairah?
No. 67.1 is the World Bank ICP 2021 national construction price-level index for United Arab Emirates, with the world equal to 100. It is a cross-country screening statistic, not a Fujairah AED/m² rate, escalation index, quote or tender estimate.
How should a Fujairah school estimate replace this screening benchmark?
Collect current Fujairah comparables on a consistent gross-floor-area basis, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- School Construction Cost Planning: Fanling, Hong Kong SAR, China
Fanling school cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Faridabad, India
Faridabad school cost planning: World Bank ICP 2021 construction PLI 37.7 (World=100), scope limits and 7 GeoNames comparison locations.
- School Construction Cost Planning: Finglas, Ireland
Finglas school cost planning: World Bank ICP 2021 construction PLI 152.8 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Galway, Ireland
Galway school cost planning: World Bank ICP 2021 construction PLI 152.8 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Garissa, Kenya
Garissa school cost planning: World Bank ICP 2021 construction PLI 64.9 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Gatineau, Canada
Gatineau school cost planning: World Bank ICP 2021 construction PLI 217.0 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.