House Construction Cost Planning: Tralee, Ireland
Tralee house cost planning using the World Bank ICP 2021 national construction price-level index of 152.8, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/IRL/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames IE dump](https://download.geonames.org/export/dump/IE.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2961123). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early house construction cost planning in Tralee, the World Bank ICP reports a 2021 Ireland construction price-level index of 152.8, with the world equal to 100. This is a national comparison—not a Tralee EUR/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Ireland in 2021; it does not measure a Tralee market basket or current house tenders. GeoNames 2961123 records the locality at 52.2704, -9.7026, with snapshot population 26,079. That ranks Tralee 17 of 50 listed places, while Killarney is the nearest listed peer at about 27 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 152.8 construction index mean?
The World Bank ICP 2021 construction PLI for Ireland is 152.8, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that house work in Tralee costs 1.528 times a current world rate.
Which Tralee inputs are known?
The reproducible locality point is 52.2704, -9.7026 (GeoNames 2961123). Its snapshot population is 26,079, ranked 17 of 50 listed places; GeoNames classifies it as a second-order administrative seat in administrative area M. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Tralee house project, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 152.8 | Retain only as dated cross-country context |
| Local EUR/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Tralee comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Tralee | Snapshot population | Admin area |
|---|---|---|---|
| Killarney | 27 | 14,504 | M |
| Ennis | 80 | 27,923 | M |
| Limerick | 85 | 102,287 | M |
| Ballincollig | 88 | 18,621 | M |
| Castletroy | 90 | 14,733 | M |
| Douglas | 97 | 26,883 | M |
| Carlow | 198 | 27,351 | L |
| Portlaoise | 183 | 23,494 | L |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (152.8 ÷ P). At P = 100 the dimensionless ratio is 1.528; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 152.8 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Tralee adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Tralee, Ireland
- School Construction Cost Planning: Tralee, Ireland
- Retail Construction Cost Planning: Tralee, Ireland
- House Construction Cost Planning: Ennis, Ireland
- All construction costs guidance for Ireland
- Climate Design Data: Tralee, Ireland
- Daylight & Orientation: Tralee, Ireland
- Solar Altitude & Azimuth: Tralee, Ireland
- Solar Shading Design: Tralee, Ireland
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames IE dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2961123). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 152.8 index give a house cost per m² for Tralee?
No. 152.8 is the World Bank ICP 2021 national construction price-level index for Ireland, with the world equal to 100. It is a cross-country screening statistic, not a Tralee EUR/m² rate, escalation index, quote or tender estimate.
How should a Tralee house estimate replace this screening benchmark?
Collect current Tralee comparables on a consistent gross-floor-area basis, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- House Construction Cost Planning: Toowoomba, Australia
Toowoomba house cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Toronto, Canada
Toronto house cost planning: World Bank ICP 2021 construction PLI 217.0 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Townsville, Australia
Townsville house cost planning: World Bank ICP 2021 construction PLI 264.1 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Trois-Rivières, Canada
Trois-Rivières house cost planning: World Bank ICP 2021 construction PLI 217.0 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Tseung Kwan O, Hong Kong SAR, China
Tseung Kwan O house cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
- House Construction Cost Planning: Tsing Yi Town, Hong Kong SAR, China
Tsing Yi Town house cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.