Updated 2026-09-15

Construction Costs

House Construction Cost Planning: Tullamore, Ireland

Tullamore house cost planning using the World Bank ICP 2021 national construction price-level index of 152.8, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/IRL/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames IE dump](https://download.geonames.org/export/dump/IE.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2961086). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early house construction cost planning in Tullamore, the World Bank ICP reports a 2021 Ireland construction price-level index of 152.8, with the world equal to 100. This is a national comparison—not a Tullamore EUR/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Ireland in 2021; it does not measure a Tullamore market basket or current house tenders. GeoNames 2961086 records the locality at 53.2739, -7.4889, with snapshot population 15,598. That ranks Tullamore 40 of 50 listed places, while Portlaoise is the nearest listed peer at about 29 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 152.8 construction index mean?

The World Bank ICP 2021 construction PLI for Ireland is 152.8, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that house work in Tullamore costs 1.528 times a current world rate.

Which Tullamore inputs are known?

The reproducible locality point is 53.2739, -7.4889 (GeoNames 2961086). Its snapshot population is 15,598, ranked 40 of 50 listed places; GeoNames classifies it as a second-order administrative seat in administrative area L. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a Tullamore house project, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 152.8Retain only as dated cross-country context
Local EUR/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

Tullamore comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from TullamoreSnapshot populationAdmin area
Portlaoise2923,494L
An Muileann gCearr3022,667L
Athlone3422,869L
Droichead Nua4722,742L
Naas5520,713L
Leixlip6715,504L
Donaghmede8915,299L
Lucan7015,269L

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (152.8 ÷ P). At P = 100 the dimensionless ratio is 1.528; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI152.8 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local Tullamore adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames IE dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2961086). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 152.8 index give a house cost per m² for Tullamore?

No. 152.8 is the World Bank ICP 2021 national construction price-level index for Ireland, with the world equal to 100. It is a cross-country screening statistic, not a Tullamore EUR/m² rate, escalation index, quote or tender estimate.

How should a Tullamore house estimate replace this screening benchmark?

Collect current Tullamore comparables on a consistent gross-floor-area basis, reconcile dwelling size, structural system, envelope specification, kitchens and bathrooms, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.