Updated 2026-09-15

Construction Costs

Office Construction Cost Planning: Ile-Ife, Nigeria

Ile-Ife office cost planning using the World Bank ICP 2021 national construction price-level index of 72.8, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/NGA/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames NG dump](https://download.geonames.org/export/dump/NG.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2338900). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early office construction cost planning in Ile-Ife, the World Bank ICP reports a 2021 Nigeria construction price-level index of 72.8, with the world equal to 100. This is a national comparison—not a Ile-Ife NGN/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Nigeria in 2021; it does not measure a Ile-Ife market basket or current office tenders. GeoNames 2338900 records the locality at 7.4824, 4.5603, with snapshot population 560,000. That ranks Ile-Ife 25 of 50 listed places, while Ilesa is the nearest listed peer at about 26 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 72.8 construction index mean?

The World Bank ICP 2021 construction PLI for Nigeria is 72.8, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that office work in Ile-Ife costs 0.728 times a current world rate.

Which Ile-Ife inputs are known?

The reproducible locality point is 7.4824, 4.5603 (GeoNames 2338900). Its snapshot population is 560,000, ranked 25 of 50 listed places; GeoNames classifies it as a second-order administrative seat in administrative area 42. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a Ile-Ife office project, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 72.8Retain only as dated cross-country context
Local NGN/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

Ile-Ife comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from Ile-IfeSnapshot populationAdmin area
Ilesa26325,00042
Osogbo32645,00042
Ondo53375,00048
Ibadan733,649,00032
Akure74730,00048
Gombe790560,00055
Ajegunle178550,00005
Owerri352545,00028

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (72.8 ÷ P). At P = 100 the dimensionless ratio is 0.728; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI72.8 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local Ile-Ife adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames NG dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2338900). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 72.8 index give a office cost per m² for Ile-Ife?

No. 72.8 is the World Bank ICP 2021 national construction price-level index for Nigeria, with the world equal to 100. It is a cross-country screening statistic, not a Ile-Ife NGN/m² rate, escalation index, quote or tender estimate.

How should a Ile-Ife office estimate replace this screening benchmark?

Collect current Ile-Ife comparables on a consistent gross-floor-area basis, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.