Updated 2026-09-15

Construction Costs

Office Construction Cost Planning: Kingston upon Hull, United Kingdom

Kingston upon Hull office cost planning using the World Bank ICP 2021 national construction price-level index of 155.3, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/GBR/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames GB dump](https://download.geonames.org/export/dump/GB.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2645425). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early office construction cost planning in Kingston upon Hull, the World Bank ICP reports a 2021 United Kingdom construction price-level index of 155.3, with the world equal to 100. This is a national comparison—not a Kingston upon Hull GBP/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across United Kingdom in 2021; it does not measure a Kingston upon Hull market basket or current office tenders. GeoNames 2645425 records the locality at 53.7446, -0.3352, with snapshot population 314,018. That ranks Kingston upon Hull 20 of 50 listed places, while Leeds is the nearest listed peer at about 80 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 155.3 construction index mean?

The World Bank ICP 2021 construction PLI for United Kingdom is 155.3, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that office work in Kingston upon Hull costs 1.553 times a current world rate.

Which Kingston upon Hull inputs are known?

The reproducible locality point is 53.7446, -0.3352 (GeoNames 2645425). Its snapshot population is 314,018, ranked 20 of 50 listed places; GeoNames classifies it as a second-order administrative seat in administrative area ENG. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a Kingston upon Hull office project, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 155.3Retain only as dated cross-country context
Local GBP/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

Kingston upon Hull comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from Kingston upon HullSnapshot populationAdmin area
Leeds80536,280ENG
Sheffield85556,500ENG
Mansfield89171,958ENG
Bradford93366,187ENG
Nottingham103323,632ENG
Preston156313,332ENG
Reading258318,014ENG
Islington246319,143ENG

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (155.3 ÷ P). At P = 100 the dimensionless ratio is 1.553; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI155.3 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local Kingston upon Hull adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames GB dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2645425). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 155.3 index give a office cost per m² for Kingston upon Hull?

No. 155.3 is the World Bank ICP 2021 national construction price-level index for United Kingdom, with the world equal to 100. It is a cross-country screening statistic, not a Kingston upon Hull GBP/m² rate, escalation index, quote or tender estimate.

How should a Kingston upon Hull office estimate replace this screening benchmark?

Collect current Kingston upon Hull comparables on a consistent gross-floor-area basis, reconcile workplace fit-out grade, services density, floorplate efficiency and vertical transport, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.

The AI-powered workspacefor architects.